Site work and paving for a sidewalk / parking lot in Pacific Grove, California. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The project will reconfigure the intersection of Central Ave & Fountain Ave to provide an All-Way Stop intersection, as identified in the Mitigation Measures of the Environmental Impact Report (EIR) for the Pacific Grove Hotel. The intersection redesign shall be consistent with the guidelines described in the "Pedestrian Safety Report" prepared for the City by the Institute of Transportation Studies (November 2008). The Applicant shall pay 25% of the cost for design and construction of the reconfiguration of the intersection to accommodate a new raised pavement crosswalk across the intersection on the south side of Central Ave. The final project landscape plan for landscaping within the public right-of-way shall be designed to incorporate the new raised pavement crosswalk. All plans for construction of improvements within the public right-of-way shall be reviewed/approved by the City Engineer. All improvements within the public right-of-way shall conform to ADA requirements, including curb ramps, bulb-outs and raised pavement crosswalks. All public works construction shall conform to City and State Standards and standard engineering practices. The project will also include resurfacing Central Ave between Grand and Fountain Avenues to address its poor pavement condition (PCI 37). The total cost, for all phases including design/engineering and construction, is anticipated to be $270,000. The project is included in the City of Pacific Groves's FY 2024-2029 Capital Improvement Program (CIP). As of July 17, 2024, information regarding a design team or a general contractor is not available. A timeline for construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Sidewalks / Parking Lot

$67,500.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
33
Bidding Soon
716
All Active Projects
282
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2025

img_map_placeholder

Central Ave & Fountain Ave, Pacific Grove, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.