BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Redstone Arsenal, Alabama. Contact the soliciting agency for additional information.

The contractor shall furnish all services, facilities, labor, parts, materials, equipment, tools, and data (other than Government Furnished Property), necessary to provide the overhaul of the following assets: NOMENCLATURE: HEAT, INTERCHANGERS, R INPUT NSN: 4130-01-597-1300 P/N: 70A145-3 Output NSN: 4130-01-597-1300 P/N: 70A145-3 ESTIMATED QUANTITY RANGE: Min Qty:10 Max Qty: 36 The proposed contractual action will result in a Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) overhaul contract, with the quantity listed above. These items are noncommercial; FAR Part 12 will not be utilized. Required delivery shall be FOB Origin. This NSN is listed as a non-critical safety item. This procurement is restricted to Enviro Systems, Inc., (CAGE: 0B9E8), and Sikorsky Aircraft Corporation (CAGE: 78286). The listed contractors are the only sources that have the technical data necessary to perform this acquisition. There is no DMWR for this requirement. Firms that recognize and can produce the required item described above are encouraged to identify themselves. POCs for this action are the Contracting Officer, Edward Peterson, email: edward.a.peterson4.civ@army.mil and the Contract Specialist, Jason Howell, email: jason.l.howell4.civ@army.mil. Award will be withheld pending receipt of sufficient funds. The solicitation will not be issued prior to the closing date stated above. SET ASIDE STATUS: NONE Approval Request (SAMSAR). All responsible sources may submit a capability statement, proposal, or quotation, which shall be considered by the agency. This requirement is currently unfunded. Award will be withheld pending receipt of sufficient funds. The closing date annotated is an estimate date and may be adjusted dependent upon the date of release of the solicitation; however, the solicitation will not close prior to the closing date stated above. The Method of Contractor Selection has not been determined at this Time

Post-Bid

Military

Public - Federal

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
21
Bidding Soon
434
All Active Projects
167
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2024

August 12, 2024

img_map_placeholder

Multiple Locations, Redstone Arsenal, AL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.