Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 30, 2025 at 7:00 PM
Updated December 31, 2025
Site work, new construction and renovation of a mixed-use development in Redstone Arsenal, Alabama. Completed plans call for the construction of a data center facility; and military facility.
The purpose of this solicitation is to award multiple IDIQ contracts for anticipated construction needs over the next five years. Named the Global Multiple Award Construction Contract (GMACC) program, the FBI has an ongoing requirement for a wide range of construction including but not limited to general construction, new construction, real property demolition and repairs, retrofit/renovation of complete building systems, site work, site utilities, and roadways. The type of real property includes but is not limited to operations buildings, hangars, commercial buildings and their mechanical and electrical systems, administrative offices, training centers, data centers, and firing ranges. Project delivery methods include, but are not limited to, Design-Build (DB), Design-Bid-Build (DBB), and Progressive Design-Build (PDB). Due to the nature of these construction methods, a combination of General Contractor and Architectural/Engineering (A/E) services are expected over the life of the program. Performance location is categorized by region between the National Capital Region (Washington, D.C, Quantico, VA, and Clarksburg, WV); Redstone Arsenal, AL; other sites across the domestic United States; and/or foreign overseas locations as needed. The total IDIQ ceiling across all contracts and all regions is $600 million. The individual task order limit is $18 million. Notwithstanding any use of the GMACC by other agencies, across all regions the FBI anticipates approximately 7 possible projects between $10M and $18M in individual value, and 42 possible projects between $750K to $9.99M in individual value. Multiple Award IDIQ Contract Regional Pool Structure: GMACC Region 1 will be a total small business set-aside with the primary areas of responsibility being the National Capital Region (NCR), which includes Washington, DC, Quantico, VA, and Clarksburg, WV. GMACC Region 2 will be a total small business set-aside with the area of responsibility being Redstone Arsenal, AL. Miscellaneous FBI and Department of Justice (DOJ) projects across the continental US (CONUS) may be solicited to GMACC Region 1 and Region 2 contract holders. GMACC Region 3 will be a full and open competition with the area of responsibility being legal attaché (LEGAT) requirements outside the United States (OUS). The FBI anticipates a majority of projects over the course of the GMACC to be located in the NCR. These requirements will primarily consist of Embassy/Consulate renovation, secure vault construction, maximum demolition, and work in Controlled Access Area (CAA) space.
Post-Bid
Data Centers
$18,000,000.00
Public - Federal
New Construction, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 11, 2025
April 1, 2026
To Be Determined, Redstone Arsenal, AL
Related To This Project
Redstone Arsenal, AL
Bid Date: Jul 14 2025
Redstone Arsenal, AL
--
Redstone Arsenal, AL
Bid Date: Jan 14 2026
Redstone Arsenal, AL
--
Redstone Arsenal, AL
--
Redstone Arsenal, AL
Bid Date: May 19 2025
Redstone Arsenal, AL
--
Redstone Arsenal, AL
--
Redstone Arsenal, AL
--
Redstone Arsenal, AL
Bid Date: Jul 10 2024
Redstone Arsenal, AL
--
Redstone Arsenal, AL
Bid Date: Jun 11 2024
Redstone Arsenal, AL
--
Redstone Arsenal, AL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
