BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 22, 2025 at 8:00 PM

Updated March 23, 2025

Site work and new construction of a mixed-use development in Tea, South Dakota. Completed plans call for the construction of a parking garage; for site work for a parking garage; retail development; and parking garage.

**As of August 21, 2024 bids received for this project were over the budget and was rejected. Project Will re-bid the in the spring of 2025. The Tea Area School District is accepting sealed bids for the construction of a combination operations shop and bus barn to be located at 500 W. Brian Street in Tea on the north end of the high school complex. Project scope: Add a post frame building for an operations shop and additional bus parking across the street from the existing bus parking buildings with provisions for a future bus parking extension Project to be completed by July 31, 2025 All bids shall be sealed in an opaque envelope upon which shall be plainly marked "Operations Shop/Bus Barn" and the name of the company bidding. If a bid is to be mailed, the bid envelope shall be sealed in a regular mailing envelope and must be received by the bid deadline to be valid. Fax and e-mail bids will not be accepted. No bidder may withdraw a bid for 30 days following the bid opening without a written request explaining the cause of the withdrawal and without written consent of the Owner after reviewing the cause. All bids should include excise tax to be paid by the bidder. Bids shall be accompanied by a cashier's check, bidder's bond, or certified check payable to "TEA AREA SCHOOL DISTRICT" for not less than five percent (5%) of the amount of such bid. A bidder's bond shall include a certified copy of the power of attorney. The Board of Education will review the bids received and act upon them at the regular or special Board meeting to be held no later than thirty (30) days following the bid opening. The Board of Education of the Tea Area School District 41-5 reserves the right to reject any and all proposals, to accept proposals it deems to be in its best interest, and to waive any and all informalities in bidding procedures. By virtue of statutory authority, preference will be given to materials, products, and supplies found or produced within the State of South Dakota. Bid Result : Building System - Coleman Building - $205,894.00 Utility Work - Red Rock Constr - $17,600.00 Electrical - JJ Electric - $31,806.00 Plumbing - Hander - $29,455.00 Concrete - Pro Contracting - $36,184.00

Bid Results

Parking Garage

$320,939.00

Public - City

New Construction, Site Work

3

3

4

2

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
49
Bidding Soon
492
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.