BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 21, 2024 at 8:00 PM

Updated August 22, 2024

Site work for a bridge / tunnel in Claflin, Kansas. Completed plans call for site work for a bridge / tunnel.

Barton County is accepting bids to widen a Reinforced Concrete Box (RCB) on NE 190 Road 1.15 miles east of Beaver, KS Questions concerning this Request for Proposal may be addressed to: Barry McManaman Barton County Engineer 1400 Main Street, Suite 208 Great Bend, KS 67530 620-793-1808 bmcmanaman@bartoncounty.org Work shall be completed within 35 working days following the Notice to Proceed Questions about the meaning or intent ofthe Bidding Documents shall be directed to Engineer. Interpretations or clarifications deemed necessary by Engineer in response to such questions will be issued by Addenda. Questions received less than 7 days prior to the bid opening date may not be answered Barton County will not consider any bids/proposals not prepared and not submitted in accordance with the provisions hereof and may waive any informalities or reject any and all bids/proposals. Any bids/proposals may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bids/proposals received after the time and date specified shall not be considered. Bids/proposals submitted after the closing date and time will be returned unopened. Bids/proposals may not be withdrawn within sixty (60) days after the actual date of the opening thereof. Barton County reserves the right to reject any and all bids/proposals and award in the County's best interests. Barton County will award bids/proposals only to responsible contractors possessing the ability to perform successfully under the terms and conditions of a proposed procurement. In addition, consideration will be given to such matters as contractor integrity, compliance with public policy, a record of past performance, delivery, warranty, integration, and financial and technical resources. Sealed proposals for the project will be accepted by Barton County until 2:00 p.m. local time, July 31, 2024, at which time and place all bids will be publicly opened and read aloud

Award

Bridges / Tunnels

$119,944.00

Public - County

Site Work

6

5

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
27
Bidding Soon
383
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2024

August 30, 2024

Project location map

NE 190 Rd, Claflin, KS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.