BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Fairfield, Alabama. Completed plans call for site work for a water / sewer project.

The Work consists of but is not limited to the installation of approximately 1,720' of 8" DICL "Zinc Coated" pipe; 2,430' of 6" DICL "Zinc Coated" pipe; 2,860' of 4" DICL "Zinc Coated" pipe; and 155 water services" and other miscellaneous associated items as necessary to complete the Work along 49th Street FF; 52nd Street FF; Avenue "C" FF; Overlook Place FF; 53rd Street FF; Court "B" FF; Avenue "D" FF and 54th Street FF located in the City of Fairfield, Alabama. Bids shall be based on unit price items and lump sum items as indicated on the Bid Form (Section 00410). No Bidder may withdraw or alter his bid within ninety (90) calendar days after the actual date of the Bid Opening Bond Notes : Each Bid shall be accompanied by a certified check or Bid Bond in the amount of five percent (5%) of the bid not to exceed $10,000.00 in the form and subject to conditions provided for in Section 00435, Bid Bond. The Successful Bidder will be required to furnish a Performance Bond and a Labor & Material Payment Bond each in an amount equal to one hundred percent (100%) of the Contract Award. Bidders shall comply with all statutory requirements in accordance with the Instruction to Bidders. Bids will only be received from CONTRACTORS who are licensed by the State ofAlabama. Contract time of commencement and completion will be in accordance with the Agreement. The Waterworks Board of the City of Birmingham ("BWWB") has adopted a voluntary Historically Underutilized Business ("HUB") Program designed to encourage the participation of HUB firms in construction projects. To that end, the BWWB will never exclude any firm from participation in, deny any person benefits of, or otherwise discriminate in connection with the award and performance of BWWB contracts based on social or economic status. Historically Underutilized Business (HUB): a business formed for the purpose of making a profit and is at least 51% owned, operated and/or controlled by one or more American citizens or permanent resident aliens who are a: Minority Business Enterprise (MBE); Women Business Enterprise (WBE); or Disadvantaged Business Enterprise (DBE) [herein sometimes collectively referred to as a HUB]. It is the intent of the BWWB to foster competition among contractors, suppliers and vendors that will result in better quality and more economical services for the BWWB. Under this program, the BWWB has established a goal of 30% participation of HUB firms for services required for BWWB construction projects. The BWWB's stated goal will not be the determining factor in construction contract awards; rather bidders must demonstrate compliance with the Good Faith Efforts, more particularly outlined in the HUB Program, toward meeting said goal. Failure on the part of a bidder to fully submit the information required herein may be considered by the BWWB in evaluating whether the bidder is responsive to bid requirements. Alabama Code 31-13-9 (1975) provides that as a condition for the award of any Contract by The Water Works Board of the City of Birmingham ("BWWB"), a business entity or employer that employs one or more employees within the State ofAlabama shall provide documentation of enrollment in the E-Verify program. If a Contract is to be awarded, it will be awarded to the lowest responsive and responsible Bidder, who has neither been disqualified nor rejected pursuant to these Contract Documents, and whose Bid based on an evaluation by the OWNER indicates that the award will be in the best interest of the project and will result in the lowest overall cost to the OWNER for completion of the project. Unless extended by OWNER, a Contract will be awarded within ninety (90) calendar days after the day of the opening of Bids. The OWNER reserves the right to reject any and all proposals, the right to waive irregularities or to accept any proposal deemed to be in the best interest of the OWNER. Doc Notes: Neither the OWNER nor the ENGINEER will be responsible for full or partial sets of Bidding Documents, including any addenda, obtained from other sources. Pre- Bid date Notes: The purpose of the Pre-Bid Conference is to raise questions pertaining to the Bidding Documents and Contract Documents and for the OWNER or its representatives to clarify any points. Bids will NOT BE ACCEPTED from any Prospective Bidder who does not attend the Pre-Bid Conference via conference call. HUB Program Acknowledgement (HUB Form 1), HUB Compliance Form (HUB Form 2), HUB Resource Engagement Form (HUB Form 3), HUB Subcontractor Performance Form (HUB Form 5) and HUB Subcontractor Utilization Form (HUB Form 6) of Section 00451 HUB Program must be submitted at the Bid Opening as shown above. Each Prospective Bidder is required to visit the site(s) at which the Work is to be performed. The OWNER will not conduct a site visit with the Prospective Bidders.

Post-Bid

Water / Sewer

$400,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
31
Bidding Soon
573
All Active Projects
238
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2024

August 26, 2024

img_map_placeholder

Multiple Locations, Fairfield, AL

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.