Site work for a civil project in Cannon Beach, Oregon. Completed plans call for site work for a water / sewer project.

Cannon Beach Water Resiliency Project Phase 2 - Water Line Replacement All bidders shall submit a completed First-Tier Subcontractor Disclosure Form in compliance with ORS 279C.370 in a separate, sealed envelope within two working hours of the bid opening time on the bid date. In general, the elements of work include, but are not limited to: . Replacement of the City's water transmission main from the source; . Pipeline work consists of open-cut trenching and trenchless installation; . An attached pipe replacement at the existing bridge crossing at Ecola Creek; and associated bank stabilization work; . Trenchless installation methods near sensitive environmental areas; . A fill station is included at the City's maintenance yard to provide water in the case of a seismic emergency. Responsive bidders shall demonstrate proven experience working around sensitive, critical infrastructure like water main, reservoirs, seismic control panels, work within City limits, etc. The Project is being funded with Federal funds made available by the Drinking Water State Revolving Fund that have statutory requirements commonly known as "American Iron and Steel;" which requires all of the iron and steel products used in the project to be produced in the United States ("American Iron and Steel Requirement") including iron and steel products provided by the Contractor pursuant to this Agreement This PROJECT is subject to both Oregon BOLI Prevailing Wage Rates and Davis Bacon wage rates. All bidders shall comply with the provisions of ORS 279C.800-870 [workers on public works to be paid not less than the prevailing rate of wage for projects over $50,000.00] and the Federal Department of Labor's Davis-Bacon Wage Determination. Contractors submitting bids are required to be registered with the Construction Contractor's Board. The Contractor shall provide a list of proposed job classifications and wage rates with their bid proposal. Statements made by the City's Representative OR City Personnel at the conference are not binding on the City unless confirmed by a written addendum by the City. The City may limit the award of schedules for the bid based on funding, acquisition of easements or other contract impacts. The contractor will be advised of the specific Contract within the final contract execution documents. Bid security in the amount of not less than 5% of the bid must accompany each bid in accordance with the Instructions to Bidders. The Owner reserves the right to reject any bid not in compliance with all prescribed public bidding procedures and requirements, may reject a bid that does not comply with the requirement to demonstrate bidder's responsibility under ORS 279C.375(3)(b), and may reject, for good cause, any or all bids upon a finding of the Owner that it is in the public interest to do so in accordance with ORS 279C.395. he Owner reserves the right to waive any bid irregularities or informalities. No bidder may withdraw or modify the bidder's bid after the hour set for the opening thereof until after the lapse of 30 days from the bid opening. The selected contractor and all contractors performing work within the City are required to obtain a City business license prior to start of work. Question Deadline 07/19/2024 Every request for such interpretation should be in writing and either addressed or emailed to City of Cannon Beach Public Works Department, Attn: Sheri Skotland , PO Box 368, Cannon Beach, OR 97110, EMAIL skotlandor@ci.cannon-beach.or.us The engineer's estimated cost range for this project is between $2.6 and $3.4 million. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PROJECT DESCRIPTION A. Summary Project Description: The project consists of the replacement of the City's main water transmission main that feeds the City from the source. The pipeline work consists of open-cut and trenchless construction, an attached pipe replacement at the existing bridge crossing at Ecola Creek, bank stabilization at Ecola Creek, and trenchless installation methods near sensitive environmental areas. A fill station is included at the City's maintenance yard to provide water in the case of a seismic emergency.

Award

Water / Sewer

$1,897,204.00

Public - City

Site Work

101

21

23

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
26
Bidding Soon
525
All Active Projects
255
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2024

September 3, 2024

img_map_placeholder

365 Elk Creek Rd, Cannon Beach, OR


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.