BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Newark, New York. Completed plans call for the renovation of a 94-square-foot residential development.

The Finger Lakes DDSO is soliciting bids for a Bath Renovation at our Cobblestone 108 IRA located at 108 Cobblestone Ter, Newark, NY 14513 This is a NYS public works project, and prevailing wages must be paid. Service-Disabled Veteran-Owned Set Aside: No Contract term: 30 days after completion of project Location: 108 Cobblestone Ter, Newark, NY 14513 DESCRIPTION: Bathroom Remodel. The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 120 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned and all materials secured at the end of each work day. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of (Bathroom Renovation), before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent. SCOPE OF WORK includes, but is not necessarily limited to the following: 1. Follow the Design provided. 2. Provide and install all materials for this remodel. 3. This project includes epoxy flooring which must be installed by a qualified installer with five years experience verified by the manufacturer. 4. Remove existing toilet, toilet and bath accessories, mirror(s), casework, miscellaneous plumbing fixtures and other accessories completely. Prior to disposal, coordinate with House Director for any items that may be salvaged. 5. Remove and replace the entire floor system, down to the existing floor joists. Examine substrate and conditions. Replace all damaged or deteriorated wood as requires, including any damaged or deteriorated floor joists. Do not proceed with installation until conditions are corrected. Provide and install two (2) layers of 3/4 " marine-grade plywood subflooring, glued and screwed to floor framing. 6. The transition to the hallway may have a maximum differential of 1/2 inch to ensure an ADA compliant transition. 7. Provide and install new resinous flooring system with integral base as per "Specification Section 096726 Quartz Flooring" attached. a. Color: As selected by House Director. 8. Provide and Install New Toilet Moun

Post-Bid

Residential Subdivision

$50,000.00

Public - State/Provincial

Renovation

7

4

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
167
Active Projects
94
Bidding Soon
932
All Active Projects
502
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2024

August 26, 2024

img_map_placeholder

108 Cobblestone Terrace, Newark, NY

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.