BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 13, 2024 at 8:00 PM

Updated August 14, 2024

Site work, paving and outdoor lighting for a mixed-use development in Eureka, Missouri. Completed plans call for site work for a bridge / tunnel; for outdoor lighting for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

https://www.myleaderpaper.com/news/eureka-fiscal-budget-emphasizes-proposition-e-projects/article_25cc5e34-4f81-11ef-9d6e-cfa8136e6250.html The city of Eureka anticipates spending nearly $27 million more than it collects in revenue this fiscal year as it completes major projects and begins new ones. The city anticipates spending $54,498,227 while collecting $27,710,070 in revenue this fiscal year, which began July 1 and ends June 30, 2025, according to the 2024-2025 budget. Eureka started the fiscal year with a projected overall fund balance of $43,106,344, and it is projected to finish the fiscal year with an overall fund balance of $16,318,187. Most of the almost $27 million of deficit spending will cover the cost of the construction of a new government center, which will be named Michael J. Wiegand Justice Center; replacing the Allenton Bridge ------------------------------------- Allenton Road Improvements Project, STP-4901 (644) The project is generally located along Allenton Road at Business Loop 44 in Eureka, Missouri. The proposed work includes: Grading, Paving, Drainage, Traffic Signals, Sidewalk, Signing, Widening, Bridge, ITS and Lighting. A certified or cashier's check or a bid bond in the amount of 5% shall be submitted with each proposal. Completion Date: October 15, 2025 (with anticipated NTP on August 21, 2024) Liquidated damages per day $ 2,300 All questions concerning the bid document preparation can be directed to Craig Sabo, at cesabo@eureka.mo.us or 636- 938-5233. Project specific questions can be directed to Frank Weatherford at flweatherford@transystems.com or (816) 830-6081. No 2nd tier subcontracting will be allowed on this project The DBE Goal for this project is 10%. Bids will be received on a unit price basis. The project will be awarded to the lowest, responsive, responsible bidder. The City of Eureka, Missouri reserves the right to reject any or all bids. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Bridges / Tunnels

$9,000,000.00

Public - City

Outdoor Lighting, Paving, Site Work

325

6

8

2

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
191
Active Projects
71
Bidding Soon
1,184
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2024

August 21, 2024

Project location map

Allenton Rd, Eureka, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.