BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Eureka, Missouri. Completed plans call for site work for a bridge / tunnel; for outdoor lighting for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

https://www.myleaderpaper.com/news/eureka-fiscal-budget-emphasizes-proposition-e-projects/article_25cc5e34-4f81-11ef-9d6e-cfa8136e6250.html The city of Eureka anticipates spending nearly $27 million more than it collects in revenue this fiscal year as it completes major projects and begins new ones. The city anticipates spending $54,498,227 while collecting $27,710,070 in revenue this fiscal year, which began July 1 and ends June 30, 2025, according to the 2024-2025 budget. Eureka started the fiscal year with a projected overall fund balance of $43,106,344, and it is projected to finish the fiscal year with an overall fund balance of $16,318,187. Most of the almost $27 million of deficit spending will cover the cost of the construction of a new government center, which will be named Michael J. Wiegand Justice Center; replacing the Allenton Bridge ------------------------------------- Allenton Road Improvements Project, STP-4901 (644) The project is generally located along Allenton Road at Business Loop 44 in Eureka, Missouri. The proposed work includes: Grading, Paving, Drainage, Traffic Signals, Sidewalk, Signing, Widening, Bridge, ITS and Lighting. A certified or cashier's check or a bid bond in the amount of 5% shall be submitted with each proposal. Completion Date: October 15, 2025 (with anticipated NTP on August 21, 2024) Liquidated damages per day $ 2,300 All questions concerning the bid document preparation can be directed to Craig Sabo, at cesabo@eureka.mo.us or 636- 938-5233. Project specific questions can be directed to Frank Weatherford at flweatherford@transystems.com or (816) 830-6081. No 2nd tier subcontracting will be allowed on this project The DBE Goal for this project is 10%. Bids will be received on a unit price basis. The project will be awarded to the lowest, responsive, responsible bidder. The City of Eureka, Missouri reserves the right to reject any or all bids. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Bridges / Tunnels

$9,000,000.00

Public - City

Outdoor Lighting, Paving, Site Work

325

6

8

2

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
42
Bidding Soon
783
All Active Projects
301
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2024

August 21, 2024

img_map_placeholder

Allenton Rd, Eureka, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.