EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 11, 2025 at 8:00 PM

Updated October 1, 2024

Site work, asbestos abatement and renovation of a library in Newtown, Connecticut. Completed plans call for the renovation of a library; for site work for a library; and for asbestos abatement for a library.

ACM contractors for the ACM Removal and Abatement at the CH Booth Library located at 25 Main Street, Newtown, CT 06470. Work is to be performed on multiple levels of the building and is tentatively scheduled to begin in the summer of 2025. The building will remain open to the public during this project Scopes of work to include but not limited to: o Provide complete abatement & disposal of all identified ACM per owners testing reports o Disposal to licensed regulated disposal area with manifest to owner. Disposal dumpsters staged in the parking lot area of building, as needed. o Radiators will be abandoned in place and require no abatement. o Phase 1 will be the original portion of the building and will require multiple penetrations including floor and ceiling penetrations. Stay onsite until work is complete. During the abatement process there will be restricted access to the original portion of the library from the staff and public. o There may be a portion of abatement in the boiler room on piping, insulation and other miscellaneous piping connections. o Must include all protection barriers and isolation of the work area from the rest of the facility as documented in the report with scope and specifications provided. o Power and water are available on site for abatement use o Pricing to be a lump sum for the work as indicated in the Hazardous Report o Pricing should exclude all taxes o Town of Newtown to review ACM contractor air quality testing per phase of abatement completion Questions concerning this bid must be submitted in writing and directed only to: Kerri Mubarek kerri.mubarek@newtown-ct.gov The BID BOND furnished, as bid security, must be duly executed by the bidder as principal. It must be in the amount equal to five percent (5%) of the total estimated bid, as guarantee that, in case the contract is awarded to the bidder, the bidder will, within ten days thereafter, execute such contract and furnish a 100% Performance Bond and 100% Payment Bond. The Purchasing Authority of the Town of Newtown reserves the right to accept or reject any or all options, or proposals; to waive any technicality in any proposal or part thereof, and to accept any proposal deemed to be in the best interest of the Town of Newtown.

Bid Results

Library

$134,926.00

Public - City

Asbestos Abatement, Renovation, Site Work

1

5

11

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Execution and Closeout Requirements, Examination and Preparation, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Applied Fireproofing, Firestopping
Division 08 - Openings

Division 08 - Openings

Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Ceilings, Painting and Coating
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Facility Electrical Power Generating and Storing Equipment, Lighting
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting

Find More Local Projects

Within 75 Miles of This Project
494
Active Projects
244
Bidding Soon
4,926
All Active Projects
2,119
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2025

March 28, 2025

img_map_placeholder

25 Main St, Newtown, CT

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Rebid-ACM Removal and Abatement in Conjunction With CH Booth Library HVAC Upgrade

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.