BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 9, 2024 at 8:00 PM

Updated August 23, 2025

Site work for a civil project in Kingston, New York. Working plans call for site work for a bridge / tunnel.

As of August 9, 2024, there were no bids received. The New York State Bridge Authority (NYSBA) is soliciting proposals from professional engineering firms to perform an updated study and conceptual design of System-Wide Pier Protection on five of six Hudson River crossings: Rip Van Winkle Bridge, Catskill, New York, Kingston-Rhinecliff Bridge, Kingston, New York, Mid-Hudson Bridge, Poughkeepsie, New York, Walkway Over the Hudson, Poughkeepsie, New York and the Newburgh-Beacon Bridge in Newburgh, New York. The study shall evaluate the potential risk for catastrophic vessel collisions, determine the most reasonable vessel design and develop at least three schemes to improve pier protection at EACH of the five Authority facilities. Study shall be prepared in accordance with the current AASHTO Guide Specifications for Vessel Collision Design of Highway Bridges. The successful proposer shall demonstrate to NYSBA a successful history of similar performances for operators of bridges of the type and size of NYSBA's facilities. Service-Disabled Veteran-Owned Set Aside: No Total MWBE Participation Goals: 30% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Business entities awarded an identical or substantially similar procurement contract within the past five years: N/A To request the proposal package, please contact Teresa Ceragioli, Assistant to the Chief Engineer, at tceragioli@nysba.ny.go v with your complete contact information. The scope of services typically performed for an Engineering study is as follows: 1. Preliminary Study a. Field investigation and research b. Reference material review c. Consultation with Authority personnel d. Presentation of study results and conceptual designs to the Authority's Executive Director and Chief Engineer 2. Final Report a. Alternative development and recommendations b. Engineers construction estimate for each alternative c. Preparation of Final Report (15 copies)

Final Planning

Bridges / Tunnels

$500,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
605
Active Projects
325
Bidding Soon
4,323
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 23, 2024

February 22, 2025

Project location map

Multiple Locations, Kingston, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.