BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 30, 2024 at 8:00 PM

Updated August 31, 2024

Site work for a water / sewer project in Saugus, Massachusetts. Completed plans call for site work for a water / sewer project.

As of august 30, 2024 project is not awarded yet. Comprehensive Sewer System Rehabilitation Subsystem 3A - CWSRF 12442. The work of this Contract includes furnishing all labor, materials, and equipment necessary to perform CCTV and cleaning of 8-inch, 10-inch, 12-inch and 15-inch sewers as well as rehabilitation of sewers through spot replacement, cured-in-place pipe (CIPP) lining, service lateral connection lining/or grouting, full length lateral lining, and manhole rehabilitation. Scope of work includes, but is not limited to the following: preparatory cleaning of sewers, service laterals, and manholes where required, including special cleaning where required; CCTV inspection; excavation and replacement of 8-inch and 15-inch sewers and service laterals; removal of protruding taps; CIPP lining of 8-inch,10-inch, 12-inch, and 15- inch gravity sewer; reinstating services and installing service lateral connection liners or grout in 4-in, 5- in, and 6-inch services extending a minimum of 24-in into the lateral; installing full length servicelateral liners extending the full length of active service laterals; management of all mainline and service flow; manhole rehabilitation including cementitious and epoxy interior manhole lining; cleaning; removal of existing lateral lining systems where required; resetting existing manhole frames and covers; installation of new manhole frames and covers and new bolt down frames and covers; filling of exterior drop connections and installation of new interior drop connections; removal of manhole steps; rock and boulder excavation, installation of new manholes, work in state highways, and all miscellaneous work and cleanup required to complete the work. The Contract Time for the Base Bid shall be a total of 180 calendar days, excluding the Town of Saugus winter moratorium and excluding final paving, commencing ten (10) days following the effective date of the Agreement. Final paving shall be completed in 14 consecutive calendar days and no later than October 15, 2025.

Bid Results

Water / Sewer

$2,189,137.00

Public - City

Site Work

11

262

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
503
Active Projects
181
Bidding Soon
3,887
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2024

September 16, 2024

Project location map

Multiple Locations, Saugus, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.