Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 7, 2024 at 8:00 PM

Updated August 8, 2024

Renovation of a residential development in Adams, Massachusetts. Completed plans call for the renovation of a residential development.

Remove existing 300 MBH boiler, and near boiler piping and accessories. All existing zone distribution piping, boiler fill piping, and air-removal / expansion tanks to remain. Remove existing power venter, and combustion air-intake duct, sealing buildings openings to match surrounding structure. 2, New, 155 MBH input, high-efficiency, direct-vent, sealed combustion air boilers, each sized for 2/3 of the total load, and piped in parallel to the existing distribution systems. All new boiler-loop HWS-HWR piping, valves, and specialties, vent and combustion air piping, condensate pumps and piping, and all accessories and controls required for a complete and operating system. Extend existing gas to each boiler, with a new quarter turn gas valve and 6" drip leg. Estimated Cost $54,000. Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Bidders requiring clarification or interpretation of the Contract Documents shall make a written request to the Architect. The Architect will answer such requests if received seven (7) calendar days before the date for receipt of the bids. Question Deadline 07/11/2024

Award

Residential Subdivision

$47,035.00

Public - City

Renovation

5

13

6

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
506
Active Projects
223
Bidding Soon
3,310
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2024

August 19, 2024

Project location map

19 Commercial St, Adams, MA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed