Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 22, 2024 at 8:00 PM

Updated August 23, 2024

Site work for a water / sewer project in Fort Wayne, Indiana. Completed plans call for site work for a water / sewer project.

**As of August 22, 2024, project was awarded to Krafft Water Solutions, awarded amount is $286,542.50.** Removal of existing drain and installation of approximately 1,950 LF of Dual Wall HDPE and Class IV RCP storm sewer in the ROW and existing easements including crossing South County Line Road, installation of 42" RCP pipe under Smith Road, six (6) drainage structures and other appurtenances as shown on the plans.

Award

Water / Sewer

$286,543.00

Public - County

Site Work

11

7

4

6

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
191
Active Projects
96
Bidding Soon
1,244
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 23, 2024

August 22, 2024

Project location map

Smith Rd, Fort Wayne, IN

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed