BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 31, 2024 at 8:00 PM

Updated August 1, 2024

Site work and paving for a mixed-use development in Fort Wayne, Indiana. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Biddershall furnish all labor, insurance, equipment, materials and power for the complete performance of this project as follows: Improve the existing alley between Richardsville Ave, Baxter St & Avondale Dr, Lafayette St by the removal and reconstruction of the existing concrete alley and adjoining sidewalk, and restoration of disturbed areas. all in accordance with the Bidding Documents and Drawing No. ST- 0751D as prepared by Transportation Engineering for the City of Fort Wayne, Indiana. Contact information and submittal procedures for such questions are as follows: A. Timothy Byer: (260) 427-5757 or timothy.byer@cityoffortwayne.org. 7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than four days prior to the date for opening of Bids may not be answered EBE GOALS - The City's goal for qualified Emerging Business Enterprise (E.B.E), as subcontractors on this project is ten percent (10%) of the contract amount. The Work will be substantially complete on or before 11/22/2024, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before 12/20/2024 No bid will be accepted from, or contract awarded to any person, firm, or corporation that is in arrears to the City, upon any debt or contract, or who has failed to execute, in whole or in part in a satisfactory manner, any contract with the City; or, who is a defaulter as to surety or otherwise, upon any obligation to the City. No bid may be withdrawn after the scheduled time for receipt of bids for at least ninety (90) days to allow review of bids before announcing award of contract. The successful bidder may be required to furnish a satisfactory Labor and Material Payment Bond and Performance Bond each in the amount no less than one hundred (100%) percent of the contract price. The Board reserves the right to reject any and all bids for failure to comply with applicable laws and/or with the Instructions to Bidders. The Board also reserves the right to waive any defect in any bid. A pre-bid conference will not be conducted for this Project

Award

Roads / Highways

$97,890.00

Public - City

Paving, Site Work

6

31

7

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
167
Active Projects
109
Bidding Soon
1,076
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2024

August 26, 2024

Project location map

Multiple Locations, Fort Wayne, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.