BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of an educational facility in Glenwood Springs, Colorado. Completed plans call for the renovation of a educational facility.

Reference Number 0000356840 Colorado Mountain College is inviting you to submit a proposal to replace the boiler systems at the Leadville campuses' New Discovery and the Aspen Campus. Both locations serve staff, faculty, and students. The Aspen Campus is located at 255 Sage Way, Aspen, CO 81611. The New Discovery building is located at 901 South Hwy 24, Leadville, Colorado 80461. Firms may bid on one or both of the Projects. Question Deadline 07/19/2024 at 2:00 PM MT Questions are submitted online No, Questions regarding this RFP should be submitted via email to bids@coloradomtn.edu. CMC will attempt to answer all relevant questions submitted to this email address prior to the question deadline in the timeline above. SERVICE TO BE PROVIDED: a. Pre-Demo. Add Fernox F3 cleaner (estimated system volume - Aspen 650 gallons, New Discovery 600 gallons) to the existing system and circulate for 7 days. Customer to global command all fan coil zone valves open during cleaning the system. The fluid will be removed/drained from the system per area code (recovered or down a floor drain). b. Power down the existing boilers, system pump(s) and lockout and tagout the equipment. c. Isolate the domestic hot water system from the incoming water source. d. Drain the water from the hot water systems to an appropriate floor drain. e. The contractor will demo equipment per Bighorn Consulting Engineers Construction Documents. f. The contractor will install the new equipment per the manufacture IO manual and Bighorn Consulting Engineers Construction Documents. g. The Contractor will fill the building loop with new glycol/ deionized water mixture (30% glycol). h. Supply and install high-quality pipe insulation for all new copper piping. Ensure insulation meets or exceeds industry standards for thermal efficiency. Verify that all insulation work is neatly finished and free of gaps. i. Provide factory start-up and verify the BACnet communication to the new boilers by the manufacturer's representative and First Year Warranty. A copy of the equipment startup report will be sent to both the CMC operational manager and the Leadville and Aspen facility managers. j. A crane may or may not be required in order to install new flues down existing ventilation to roofs at both Leadville and Aspen. Contractor to verify at time of walk through. The Aspen boiler system will need to be scheduled to be replaced starting the first week of October 2024. Ideally the New Discovery Building boiler system will be scheduled to be replaced upon finishing the Aspen boiler system replacement. Contractor to provide an alternative schedule if this timeline is not possible. Target Award Date (Subject to Change) AUGUST 12, 2024 4:00 p.m. CMC reserves the right to reject, in whole or in part, any timely submitted Proposal that fails to comply with the material terms and conditions of this RFP; or, is otherwise not in the best interests of CMC or fair competition. CMC reserves the right to cancel this RFP, in whole or in part, at any time, if it is in the best interest of CMC or fair competition.

Post-Bid

Educational

$300,000.00

Public - State/Provincial

Renovation

8

4

5

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
7
Bidding Soon
141
All Active Projects
55
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2024

October 1, 2024

img_map_placeholder

Multiple Locations, Glenwood Springs, CO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.