BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a bridge / tunnel in Poplarville, Mississippi. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

construction of 3.200 miles of MAINTENANCE (OTHER THAN BRIDGE) on the Oak Hill Road being known as State Aid Project No. SAP-55(27)M in Pearl River County Mississippi. Principal Items of Work Are Approximately as Follows Roadway Items: Quantity Unit Mobilization 1.000 Ls Granular Material (Lvm), (Class 6, Group C) 162.000 Cy Hot Mix Asphalt, St 9.5 Mm 3,246.000 Him Cold Milling of Bituminous Pavement, All Depths 36,373.000 Sy Polymerized-emulsified Asphalt, Grade Crs-2p 18,654.000 Gal Seal Aggregate Cover Material, Size 56, (Crushed Stone or Slag) 717.000 Cy Blotter Material 53.000 Cy Maintenance of Traffic 1.000 Ls Additional Construction Signs 0.000 Sf Temporary Traffic Stripe, Continuous Yellow, Paint 23,860.000 Lf Temporary Traffic Stripe, Skip Yellow, Paint 1.676 Me For questions regarding the website registration and online orders, please contact Plan House at 662-407-0193. Certified check or bid bond for five percent (5%) of the total bid, made payable to Pearl River County and the State of Mississippi must accompany each proposal.

Award

Bridges / Tunnels

$712,029.00

Public - County

New Construction, Paving, Site Work

14

5

6

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
28
Bidding Soon
429
All Active Projects
180
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2024

September 2, 2024

img_map_placeholder

Oak Hill Rd, Poplarville, MS

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.