BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Redmond, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Redmond Central Connector Phase III Construction of approximately 1.6 miles regional trail along the former Burlington Northern Railroad corridor from the 9900 Block of Willows Road NE to NE 124th Street. The trail will generally consist of a 12-foot wide paved (hot mixed asphalt pavement) trail with 2-foot gravel shoulder along the west side and 3-foot gravel shoulder along the east side. Grading and installation of storm drainage facilities. Install raised trail crossing and associated improvements at driveway crossings. Intersection improvements at 9900 Block, NE 100th Court, NE 102nd Street, NE 116th Street, and NE 124th Street (curb ramps, curb and gutter, pavement restoration, hardscape/landscape features, and pavement marking). Roadway reconstruction at NE 116th Street. New pedestrian traffic signal at 9900 Block and NE 100th Court. Pedestrian traffic signal modifications at NE 124th Street. Traffic signal modifications at NE 102nd Street and NE 116th Street. New illumination system along the trail from 9900 Block to NE 124th Street. Installation of landscape and urban design improvements. Wetland and stream mitigation. And other work necessary to complete the Project. The Engineer's Estimate for this work is $3,800,000 to $4,200,000. Questions or comments about these Bid Documents should be directed in writing only (mail or email) to the attention of the City Project Manager/Project Engineer: Mike Haley, PE, PO Box 97010, MS1NPW, Redmond, WA 98073- 9710, or mhaley@redmond.gov. Questions received less than 2 business days prior to the date of bid opening may not be answered This Project shall be physically completed within ***one hundred and twenty (120)*** working days The Contracting Agency has established a DBE COA Goal for this Contract in the amount of: 15% *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Roads / Highways

$5,639,490.00

Public - City

Paving, Site Work

127

19

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
46
Bidding Soon
904
All Active Projects
357
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2024

September 23, 2024

img_map_placeholder

Multiple Locations, Redmond, WA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.