Published August 1, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a playground / park / athletic field in West Valley City, Utah. Working plans call for site work for a playground / park / athletic field.

Make improvements to an existing park, that is to include four (4) pickleball courts (two (2) in the base bid, and two (2) in an alternate bid) along with their accessories, concrete walkways, concrete pads for five small pavilions, along with renovating the landscaping and irrigation system to accommodate the improvements. Salt Lake County Contracts and Procurement, on behalf of Parks and Recreation invites your company to bid on project Decker Lake Park Improvements located at 2300 Decker Ln, West Valley City, UT 84119. TIME OF COMPLETION 5.1 Upon receipt of a fully executed contract and other required documentation, an official Notice to Proceed (NTP) will be issued. (a) The Contractor will have 120 calendar days to complete the project (b) The Contractor will conduct a punch list walk with the County no later than 14 calendar days prior to the expiration of the Contract Time (c) There will be a $500 charge per calendar day for liquidated damages Each bid must be accompanied by bid security bond, issued by a surety authorized to do business in Utah, on the American Institute of Architects (AIA) form A310-2010. Penal sum of the bond shall be 5% of the amount bid for the work of the Project. Failure to include bid bond as security for acceptance of offer shall render a bid non-responsive. Bidder agrees that said amount shall be forfeited to County as liquidated damages if Bidder shall fail to execute a contract and furnish the required payment and performance bonds within ten days after Contracts and Procurement notifies the General Contractor. The project will then be offered to the next bidder in line. Bidders must hold, at a minimum, a B-100 or E-100 license. All subcontractors must hold the proper license for the portion of the work of the Project they are performing, and at the request of the County, provide any and all information required to substantiate their proper licensure.

Final Planning

Playgrounds / Parks / Athletic Fields

$425,000.00

Public - County

Site Work

18

18

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Specialty Placed Concrete, Post-Tensioned Concrete
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Vapor Retarders
Division 09 - Finishes

Division 09 - Finishes

Tiling, Quarry Tiling, Flooring, Resilient Flooring, Carpeting
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Play Field Equipment and Structures, Playground Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Other Furnishings, Site Furnishings
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Plants, Shrubs, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
27
Bidding Soon
663
All Active Projects
284
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2024

August 1, 2025

img_map_placeholder

2300 Decker Ln, West Valley City, UT

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Decker Lake Park Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.