BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 13, 2025 at 7:00 PM

Updated February 14, 2025

Site work and paving for a mixed-use development in Whitewater, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

20250211022. 3835-05-74 WISC 2025319 C Whitewater, Walworth Ave, W City Limits to S Janesville St, LOC STR Walworth County Work Summary: Removals, Milling, Grading, Aggregate, Asphalt Pavement, Curb and Gutter, Concrete Sidewalk, Erosion Control, Traffic Control, Pavement Marking, Restoration. Work Type: A DBE Goal: 5% Completion Date Contract: August 29, 2025 Guaranty Required: $75,000.00 Estimate Anticipated Funding $2,000,000 - $2,999,999 With each sealed proposal, the bidder must include a properly executed bid bond or a cashiers check, certified check, bank's check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. Unless otherwise specified in this advertisement, the Department will issue bidding proposals only to those who have established their qualifications for the work to be bid upon. Any prospective bidder who has not established their qualifications must file a sworn statement with the Department not less than ten business days prior to the time set for submitting bidding proposals on a form furnished by the Department. The Department will evaluate this statement and will issue bidding proposals as it deems warranted. Question Deadline 02/10/2025 at 11:45 AM CT, Any question submitted after 2 p.m. the Thursday prior to the letting may not have sufficient time to prepare a thorough response or develop a contract addenda. WisDOT - 022 - C Whitewater, Walworth Ave *the Value for This Project is Based on a Financial Range. The Value is Listed as the Highest Possible Cost From the Range Provided by a Stakeholder or Official Project Document. The work under this contract shall consist of removing asphaltic surface milling, common excavation, HMA pavement, spot curb and gutter replacement, concrete sidewalk, marking lines, traffic control and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract. This special provision describes researching and locating existing land parcel or boundary monuments located in permanent easements, temporary easements, or construction permit areas, which may be lost or disturbed by construction operations. This provision does not relinquish the contractor's responsibility of standard spec 107.11. This special provision describes the removal and disposal of additional 2-inches of asphaltic pavement by milling in areas of distressed pavement. This will be completed in spot locations throughout the project as directed by the engineer. The Wisconsin Department of Transportation is committed to the compliant administration of the DBE Program. The DBE provisions work in tandem with FHWA 1273 and WisDOT's Standard Specifications for Highway and Structure Construction and Construction and Materials Manual. The WisDOT Secretary is signatory to assurances of departmentwide compliance. The Department assigns the contract DBE goal as a percentage of work items that could be performed by certified DBE firms on the contract. The assigned DBE goal is expressed on the bid proposal as a percentage applicable to the total contract bid amount. (1) WisDOT identifies the assigned DBE goal in its contract advertisements and posts the contract DBE goal on the cover of the bidding proposal. The contractor can meet the assigned contract DBE goal by subcontracting work to a DBE firm or by procuring services or materials from a DBE firm. (2) Under the contract, the prime contractor should inform, advise, and develop participating DBE firms to be more knowledgeable contractors who are prepared to successfully complete their contractual agreement through the proactive provision of assistance in the following areas: o Produce accurate and complete quotes o Understand highway plans applicable to their work o Understand specifications and contract requirements applicable to their work o Understand contracting reporting requirements (3) The Department encourages contractors to assist DBE subcontractors more formally by participating in WisDOT's Business Development program as a mentor, coach, or resource. For comprehensive information on the Disadvantaged Business Enterprise Program, visit the Department's Civil Rights and Compliance Section website.

Bid Results

Roads / Highways

$1,448,854.00

Public - State/Provincial

Paving, Site Work

129

5

6

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
514
Active Projects
187
Bidding Soon
3,327
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2025

April 14, 2025

Project location map

W Walworth Ave, Whitewater, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.