BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Salem, New Hampshire. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and development.

The Town of Salem, NH is seeking the services of a contractor to reconstruct and improve the existing 0.75 mile trail at Hedgehog Park to meet USFS Trail Accessibility Standards with compacted gravel/stone dust surface at 5-width. The scope of work Concept Plan is included as Appendix A of the RFP. The following services listed that are required by this project. Removal of vegetation within 8-ft. width by 10-ft. height corridor, except large trees Excavation of organic soils within 5-ft. tread way Primary Accessible trail: 5-ft. wide gravel & stone dust with 6-ft. X 6-ft rest areas at 200ft. intervals. Accessible Side Trails: 4-ft wide gravel and stone dust trail with 8-ft. X 8-ft. Rest areas. Stonework: Stone retaining walls for 4 rest areas at shoreline. Installation of geotextile fabric, crush stone fill as required, 3/4 " ledge pack gravel trail base, 1/4 " stone dust surfacing, drainage features/culverts as required. Obtain all necessary local and state permits as required Qualified companies requiring additional information or clarification relative to the contents of the bid may direct inquiries to Gia Faccadio, Purchasing Agent, gfaccadio@salemnh.gov. This project is located at Hedgehog Park, 53 Lowell Rd. Salem, NH. Proposed is a multi-use loop trail around Hedgehog Pond with 2 points of access to the parking lot. The project is intended to improve access to the trail for people with a wider range of ability levels. Construction of an All Persons Trail with a compacted gravel surface (gravel & stone dust) built to USFS Trail Accessibility Standards. Trail development must accommodate summer and winter uses. The Town's goal with this project is to create a sustainable trail system that is optimized for use by people of all abilities and mobilities, including people who use wheelchairs. The trail should be built in a manner that minimizes impacts to the natural environment. The contractor will be required to address any failure of trail structures beyond routine maintenance within the first 3 years following project completion. Construction process entails the following: Removal of vegetation within 8-ft. width by 10-ft. height corridor, except large trees Excavation of organic soils within 5-ft. tread way Primary Accessible trail: 5-ft. wide gravel & stone dust with 6-ft. X 6-ft rest areas at 200ft. intervals. Accessible Side Trails: 4-ft wide gravel and stone dust trail with 8-ft. X 8-ft. Rest areas. Stonework: Stone retaining walls for 4 rest areas at shoreline. Installation of geotextile fabric, crush stone fill as required,3/4" ledge pack gravel trail base,1/4" stone dust surfacing, drainage features/culverts as required. Obtain all necessary local and state permits as required Question Deadline 07/12/2024 Any questions or inquiries must be submitted in writing and must be received by the Purchasing Department no later than seven (7) calendar days before the Request for Proposal due date to be considered. Any changes to the Request for Proposal will be provided to all bidders of record. Qualified companies requiring additional information or clarification relative to the contents of the bid may direct inquiries to Gia Faccadio, Purchasing Agent, gfaccadio@salemnh.gov.

Bid Results

Sidewalks / Parking Lot

$117,500.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
325
Active Projects
206
Bidding Soon
2,681
All Active Projects
1,184
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2024

August 19, 2024

img_map_placeholder

53 Lowell Rd, Salem, NH

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.