BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a mixed-use development in Colman, South Dakota. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

https://moodycountyenterprise.com/stories/high-interest-in-new-hawks-school-addition,93247 High interest in new Hawks school addition More than a dozen local contractors submitted bids for the new addition to Colman-Egan School. District officials were surprised and pleased with the strong turnout, given how busy companies have been in recent years. Contractors expressed satisfaction with their bids, which were all within a close final cost range, even if they aren’t awarded the project. Posted Wednesday, August 14, 2024 12:00 am Carleen Wild Colman-Egan School District officials and the engineering firm overseeing a new addition to the local school are pleased with the options before them. A bid opening this past Tuesday had Kyle Fisel, project manager with the engineering firm ISG, school business manager Luann Smith, and Superintendent Scott Hemmer reviewing 14 bids for the 2024-25 school expansion project. That high a number of bidders, Fisel noted, has been unusual, as the market has not allowed for it. “In recent years, since COVID and post-COVID, it’s been a struggle to get contractors. People are super busy, and they’re not interested in bidding on work because they have a lot of work, but there seems to have been a change in that lately, and all of a sudden people are very hungry for work again. We were very happy to see this many people again because it drives the competition for a lower project cost,” Fisel said. Representatives for each company sat in the school lunchroom during the letting, listening intently and jotting down competitors’ bids, as Fisel read each new proposal aloud. By law, the district must go with the lowest bidder unless there is something missing or the bid is incomplete. If that is the case, the project will likely be offered to Puetz Design & Build of Mitchell. All of the bids came in between $4 million and $5 million. Puetz bid $4,145,135, the lowest by a couple hundred thousand dollars. The highest bid, including all aspects of the project, was just over $4.9 million. With that final cost as the target, no portion or final touch of the proposed $6.3 million project would be left undone. “We believe all components should remain within the project given the bids,” Hemmer said. Notice of the award was scheduled to be given on Aug. 19, but a decision will likely be announced at the school board meeting this past Monday after calls have been made to verify availability. Fisel said he planned to have a letter of recommendation ready by the time the board meets. Construction is expected to begin this fall, but the final decision rests with the contractor and their ability to complete the project before the start of the 2025-26 school year. The $6.3 million addition, approved by voters this past fall, includes a new preschool room, six other classrooms, a flexible learning space, and a new weight room. The weight room will be a shared space for public use, but details on that element are yet to be determined. ---------------------------------------- Construction of a new addition that includes (7) classrooms, a weight room, restrooms, and other general circulation spaces. The addition will also include a storm shelter and other Work indicated in the drawings and specifications. Question Deadline 07/30/2024 Direct questions to the Architect's Representative: 1. Kyle Fisel, telephone: 605.910.4732, e-mail: Kyle.Fisel@ISGInc.com Clarifications requested by bidders must be in writing not less than 7 days before date set for receipt of bids. The reply will be in the form of an Addendum, a copy of which will be forwarded to known recipients

Award

Educational

$4,145,135.00

Public - City

Addition, Demolition, Renovation, Site Work

95

27

61

7

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
13
Bidding Soon
185
All Active Projects
84
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2024

September 23, 2024

img_map_placeholder

200 S Loban Ave, Colman, SD

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.