EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 29, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a sidewalk / parking lot in Pepper Pike, Ohio. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Document Notes: set of the bid package and one complete set of pdf files. Additional sets of bid documents can also be ordered for an additional cost by visiting online emailing seblue@seblueprint.com, calling 216-241-2250 or visiting an SE Blueprint location. Each bid must be made upon the Proposal form provided and must be accompanied with a bid bond for the full amount of the bid in favor of the City of Pepper Pike given by a surety company authorized to do business in the State of Ohio, or a certified check or cashier's check in the amount of ten percent (10%) of the amount bid but in no event less than One Hundred Dollars ($100.00). The amount of such bond or check to be paid to the City as stipulated for liquidated damages in the event that the successful bidder fails to enter into the contract under the terms of his/her bid within fourteen (14) days after being notified of the award of the contract to such bidder. The bond of an unsuccessful bidder shall forthwith be canceled and the check of such bidder returned, or, in the event the check has been deposited the amount shall be returned. When a Contract is entered into, a Surety Bond satisfactory to the City in an amount equal to 100% of the total bid shall be furnished. No bidder may withdraw his/her proposal within 45 days after the opening thereof. Bidders must comply with the prevailing wage rates on Public Improvements in Cuyahoga County and the City of Pepper Pike, Ohio, as determined by the Ohio Department of Industrial Relations. The right is reserved to accept any bidder, to reject any or all bids, and to waive informalities should it be deemed to be in the best interest of the City of Pepper Pike to do so. The scope of work for the light commercial agreement shall apply to the following small medical clinics, stand-alone doctor and dentist offices with up to 600 amp service (not attached to a hospital), gas stations/convenience stores, fast food restaurants and franchised chain restaurants including independent bars and taverns, places of worship, funeral homes, nursing homes, assisted living facilities and day-care facilities under 15,000 sq ft, small office, retail/wholesale facilities under 15,000 sq ft with less than 10 units attached, storage units, car washes, express hotels and motels (4 stories or less) without conference or restaurants facilities, residential units (subject to Davis Bacon Rates) small stand-alone manufacturing facilities when free standing and not part of a larger facility (less than 15,000 sq ft) solar projects (500 panels or less) unless other wise covered under this agreement, lighting retrofits (when not associated with remodels involving branch re-circuiting) Lighting retrofits shall be defined as the changing of lamps and ballasts in existing light fixtures and shall also include the one for one replacement of existing fixtures.

Award

Sidewalks / Parking Lot

$966,620.00

Public - City

Paving, Site Work

29

9

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Terrazzo Flooring
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Postal Specialties
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
74
Bidding Soon
1,139
All Active Projects
509
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2024

September 17, 2024

img_map_placeholder

Gates Mills Blvd, Pepper Pike, OH

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Lander road pedestrian trail & gates mills boulevard multi-purpose trail project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.