BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a fire / police facility in Orange Park, Florida. Working plans call for the renovation of a fire / police facility.

Project Description: Rework HVAC for fresh air intake to address humidity and Temperature issues. Project Location: Fire Station #18 - 207 Blanding Blvd. , Orange Park, Florida, 32073 If you need immediate assistance, at any point during the solicitation process, please email the Purchasing Department at: Purchasing@Claycountygov.com in addition to the Purchasing Department Staff Member Question Deadline 07/19/2024 at 4:00 PM For questions about Clay County permitting please contact: Clay County Building Department Phone: (904) 269-6307 Email: permits@claycountygov.com Liquidated Damages The Contractor shall be assessed Liquidated Damages (LD) of $100.00 for each day past final completion date set by the contract. The Clay County Board of County Commissioners are requesting quotes from licensed Contractors to rework HVAC for fresh air intake to address humidity and temperature issues. The Scope of Work shall include but is not limited to completing: Removal of Existing Unit: Safely remove the existing Minisplit unit located in the closet of the rear bedroom. The County will retain the removed existing Minisplit unit, coordinate County Maintenance Staff. Installation of New 1-Ton Air Handling Unit (AHU) and Condenser: Provide and install a new 1-ton AHU and Condenser with an integrated heater. Ensure that the new units are suitable for the specified space and meet energy efficiency standards. New RA/SA Box: Supply and install a new Return Air (RA) and Supply Air (SA) box. Ensure the box is appropriately sized and positioned for optimal airflow. OA Vent Penetration: Penetrate the exterior wall to set up an Outside Air (OA) vent. Properly seal the penetration to prevent air and moisture leaks. Interior Piping to Honeywell OA Module: Connect the interior piping to the new Honeywell OA module as specified. Ensure all connections are secure and leak-free. Ductwork: Run new 4-inch Return and Supply flexible ducting to key areas. Install grid-type vent facings that match the existing interior design. Wiring: Connect new wiring, including line set and control wiring, to the new units. Run control wiring to a central location and install a new centralized thermostat. Airflow Adjustments: Adjust the AHU for adequate air movement, ensuring proper distribution and balance. Adjust the Fresh Air Intake (FAI) for minimum and maximum damper positioning to optimize air exchange. System Startup: Perform system startup procedures. Ensure the unit operates at maximum performance, conducting any necessary adjustments. It is the responsibility of the Contractor to verify the voltage and phases on each of the current unit to furnish replacements with the same specifications. Should the County need temporary cooling units the County reserves the right to negotiate the fee with the Awarded Contractor.

Final Planning

Fire / Police

$100,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
45
Bidding Soon
739
All Active Projects
304
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2024

February 17, 2025

img_map_placeholder

207 Blanding Blvd, Orange Park, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.