BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Joplin, Missouri. Completed plans call for the renovation of a educational facility.

The scope of this project includes, but is not limited to, the following: renovation of an educational facility. As of July 9, 2024, a construction manager has been selected for this project. A firm construction timeline for this project has not yet been released. The CM is Soliciting Bids for This Project Through Multiple Bid Packages From Qualified Subcontractors. Refer to Scopes of Work in Section 00 20 00. The Project Includes Providing All Labor, Materials, Equipment, Supervision, Accessories, Hauling, Storage, Tools and Incidentals Necessary for the Construction and Completion of the Work According to the Bidding and Contract Documents and Consists of the Following: A Complete Interior and Partial Exterior Renovation of the Existing Building Including but Not Limited to, Site Demo, Sitework and Grading Operations, Storm, Chain Link Fencing, Building Demo, Concrete, Masonry, Structural Steel, Rough Carpentry, Millwork, Doors, Windows, Glazing, Hardware, Overhead Doors, Metal Stud Framing, Gypsum Board, Act, Flooring, Painting, Specialties, Window Shades, Fire Sprinkler, Plumbing, Hvac, Electrical, Communications & Security Last Day for Questions Shall Be the Thursday Prior to the Bid Day: Re Smith Construction Company Crowder Victory Renovation Attn: Clint Walton Estimating@resmithconst.com 1036 W. 2nd Street Joplin, Mo 64801 (417) 623 4545 Location 3405 Hammons Blvd. Joplin, MO 64804 Bids May Not Be Withdrawn for a Period of (60) Sixty Days. Damages Real Damages/delay Damages in the Amount of $500.00 Per Calendar Day and Liquidated Damages in the Amount of $1,000.00 Per Calendar Day May Be Assessed Every Day That Work is Not Completed Per the Construction Schedule and After the Scheduled Final Completion Date is Not Achieved The Owner Shall Retain an Amount of 5% of the Cost of Construction Throughout the Construction Period. The Retainage Will Not Be Reduced During the Project and Will Only Be Released After Final Payment is Paid to the Cm as a Part of the Cm's Project Closeout Process. A Performance and Payment Bond May Be Required of the Successful Bidders in the Amount of 100% of the Contract Amount. The Bond Amounts Will Need to Be Listed on the Bid Form in the Space Provided. It Shall Not Be Included in the Bid Package Total Base Bid or Alternate(S). This Project Does Comply With the Current Mo Dol Prevailing Wage Order for Newton County, Mo #31. See Section 00 51 00 for Wage Order Tax Exempt Status Bids Shall Not Include Sales Tax on Material. The Bidders Understand That the Cm and the Owner Reserves the Right to Award the Contract to The Best Responsible Bidder, and to Reject Any or All Bids and/ or to Waive Any and All Technicalities, Irregularities or Informalities in the Bidding Process as They See Fit. (Refer to Division 00 Documents for a Clarification on Evaluating Lowest Responsible Bidder). No Bids May Be Withdrawn for a Period of Sixty (60) Days Subsequent to the Specified Time for Receipt of Bids.

Post-Bid

Educational

$200,000.00

Public - County

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
24
Bidding Soon
508
All Active Projects
212
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2024

September 13, 2024

img_map_placeholder

3405 Hammons Blvd, Joplin, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.