BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 29, 2025 at 7:00 PM

Updated December 30, 2025

Site work for a water / sewer project in Burlington, Ontario. Design plans call for site work for a water / sewer project.

WM and WWM Replacement on Mainway & Upper Middle Rd and New WM on Fairview St in the City of Burlington. Assignment #1 - replacement along Mainway, from Guelph Line to Walkers Line (Ward 4); Assignment #2 - Upper Middle Rd, from Mountain Grove to Guelph Line (Ward 3); Assignment #3 - Fairview St, from Harvester Rd to Sherwood Forest Park (Ward 5). TIMELINE: Project is in design. Tender and construction will proceed in packages, beginning in 2026 with Upper Middle Road and Fairview Street. Mainway to be tendered in 2027. Further update early summer 2026.

Design

Water / Sewer

$31,578,000.00

Public - County

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
668
Active Projects
390
Bidding Soon
4,822
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

Project location map

Multiple Locations, Burlington, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.