BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work, new construction and renovation of an educational facility in Irvine, California. Completed plans call for the demolition of a educational facility; for the construction of a educational facility; for site work for a 86,887-square-foot educational facility; and for the renovation of a educational facility.

PREQUALIFICATION REQUIRED: Prequalification process is complete for General Contractors. PROJECT DESCRIPTION: The project consists of the demolition of existing powerhouse mechanical equipment for new cooling tower and boilers in the mechanical yard at Power House 2. Includes new equipment & structural anchorage and supports. A new 54,390 SF two-story student services building with a steel structure, precast walls, PVC roof, mechanical, plumbing, and fire sprinklers will be constructed. Lot 10 will be modified for new drop-off and circulation, with a new exit driveway to Irvine Center Drive. The existing B-100 building will be demolished, and site utilities such as electrical, fire water, storm drains, sewer, gas, telecom, and reclaimed water lines will be relocated. New fire hydrant locations, and modifications will be made to fire access lines, parking, drop-off areas, pedestrian paths, entry, and landscaping. A new 32,497 SF two-story student union building with a steel structure, exterior plaster, MEP systems, food services, fire sprinklers, a kitchen, and CMU walls will also be built. The project includes quad and student plaza development, the demolition of the existing SSC student services center building and Powerhouse 3, and the construction of a new parking lot 9. Deferred Approval Items The general contractor will be responsible for completing design and obtaining DSA approval for the following deferred approval items: (i) Precast Concrete, Exterior Wall Panels & (ii) Elevator Guiderail Supports and Brackets. Estimated Cost: $60,000,000 Project Duration: 33 Months Prevailing Wage Project All subcontractors may be required to bond over $150,000 (submit bond rate with bid) Liquidated Damages: $4,000 / Day Hold Bids for 60 days

Bid Results

Educational

$70,900,000.00

Public - County

Demolition, LEED Certification, New Construction, Renovation, Site Work

772

88

41

7

Subscribe For Documents

216 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
237
Active Projects
111
Bidding Soon
2,432
All Active Projects
1,087
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2024

January 16, 2025

img_map_placeholder

5500 Irvine Center Dr, Irvine, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.