BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 21, 2024 at 8:00 PM

Updated August 22, 2024

Site work for a mixed-use development in Whitehorse, Yukon Territory. Completed plans call for site work for a municipal facility; and playground / park / athletic field.

The City of Whitehorse ("City") is inviting Bids from qualified vendors, referred to as "Bidder" with the experience to install eighteen (18) electric vehicle (EV) charging stations (the Work) at various City of Whitehorse locations. The City expects the EV charging stations to be complete and ready for use by September 30, 2024. The intent of this Request for Tender (RFT) is to obtain the best price for this project ("Project"), based on the pricing set out in T-1 Schedule of Quantities and Prices. The City of Whitehorse ("City") is inviting Bids from qualified vendors, referred to as "Bidder" with the experience to install eighteen (18) electric vehicle (EV) charging stations (the Work) at various City of Whitehorse locations. The intent of this Request for Tender (RFT) is to obtain the best price for this project ("Project"), based on the pricing set out in T-1 Schedule of Quantities and Prices. The City is planning to install the EV charging stations at the following locations. a. Canada Games Centre: 200 Hamilton Blvd, Whitehorse YT b. Whitehorse Operations Building: 197 Range Rd, Whitehorse YT c. Parks Building: 139 Tlingit St, Whitehorse YT d. Two Mile Booster Station: 102 Industrial Rd, Whitehorse YT e. Public Safety Building: 305 Range Rd, Whitehorse YT f. Building Maintenance Shop: 305 Range Rd, Whitehorse YT The locations of these charging stations, as well as the extents required to upgrade existing services to accommodate the additional load, are outlined in Section 4.1, Appendix D -Electrical Drawings, and Appendix E- Technical Specifications. The City had ordered the level 2 chargers from Flo. Installation instructions from the supplier, Flo, for the EV charging stations are provided in Appendix F - Core+ EV Charging Station Installation Guide and Appendix G - Core+ Max EV Charging Station Installation Guide. The City had initiated electrical service upgrade with ATCO Electric Yukon for the Building maintenance shop. This will ensure there will be sufficient electrical capacity available at this location for adding the electrical load of EV charging stations. Documents can be obtained from https://whitehorse.bonfirehub.ca/opportunities/82058 Question Deadline 07/24/2024 at 3:00 PM PT

Award

Municipal

$201,000.00

Public - City

Site Work

10

36

10

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
5
Bidding Soon
56
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2024

September 2, 2024

Project location map

Multiple Locations, Whitehorse, YT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.