BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Hart, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of August 22, 2024 this project has awarded to Wadel stabilization for $302,059.30. The project consists of furnishing all material and constructing the following: 0.405 Miles of HMA Surface Removal, Aggregate base conditioning, concrete curb and gutter replacement, sidewalk improvements for ADA compliance, storm sewer structure adjustments, HMA Paving, and permanent pavement markings. Document Notes: Bidder assumes sole risk for any project specifications, electronic or hard copy, obtained other than directly from Prein&Newhof. Hard copy specifications are available for the fee of $50 dollars. A $15 dollar charge will be added to all mailed specifications. Fees are payable by cash or check only and are not refunded. The work to be performed under this contract will be financed and paid for by local funds. A bid bond, certified check, or cashier's check payable to City of Hart in an amount equal to five percent (5%) of the total price shall accompany each bid. This surety shall bind the bidder for a period of Sixty (60) days after the receipt of bids. If submitting separate bids for each schedule only one bid surety will be required based on the Fall of 2024 schedule. COMPLETION DATE The project is intended to follow the following schedule: Substantial Completion: November 15, 2024 Final Completion: November 29, 2024 The Owner will consider an alternative schedule with the following completion dates: Substantial Completion: May 23, 2025 Final Completion: June 6, 2025 Contractor must provide indication of what schedule it proposes to complete the work on the proposal cover sheet. Bidders may submit bids for each schedule. The Owner will review the bids with both cost and schedule being considered and reserves the right to award based on either schedule. The contract will be written with the awarded schedule included. The Owner prefers completion during the fall of 2024.

Award

Roads / Highways

$302,059.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
22
Bidding Soon
342
All Active Projects
152
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2024

September 2, 2024

img_map_placeholder

W Main St, Hart, MI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.