BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Highwood, Illinois. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The City of Highwood Public Works Department (hereinafter City) is seeking Phase III Engineering Services for the Washington Avenue STP Resurfacing Project. This phase of the project is funded through the Illinois Surface Transportation Program (STP); therefore, all work must be done in accordance with Federal Guidelines. The Consulting Engineer shall perform and carry out, in a professional and satisfactory manner, the necessary services required to complete the requirements included in the project. The City shall provide a qualified Liaison Engineer to assist the Consultant in City interpretations. The services to be provided related to this Request for Qualifications (RFQ) are described in the Minimum Scope of Services section of this RFQ. All work must adhere to City and Illinois Department of Transportation (IDOT) standards as required. The Consulting Engineer shall have successfully completed a minimum of three projects of the same type and size to the Washington Avenue STP Resurfacing Project. The proposed Project Manager shall have a minimum of five years of experience in managing Phase III Engineering on IDOT Bureau of Local Roads and Streets (BLRS) projects. A list of these projects and the IDOT BLRS and local agency contacts for the project should be provided. This project of work consists of the following improvements: The work consists of 2" HMA Milling and Resurfacing with 1.5" of HMA Surface Course and 0.75" of Polymerized Leveling Binder, as well as Class D Patches Type I-IV 6 Inch (for asphalt and concrete bases), Combination Curb and Gutter removal and replacement (as necessary), PCC Sidewalk 5 Inch removal and replacement (as necessary), Driveway Apron removal and replacement (as necessary), Detectable Warnings for ADA Accessibility & Compliance, Storm & Sanitary Sewer repairs, Storm & Sanitary Structure repairs and adjustments, Thermoplastic Pavement Markings, Landscape Restoration (as necessary), and any additional restoration necessary (as determined by the Engineer in the field). The schedule on this project is critical and a team with the experience and relationship with IDOT staff to complete the construction in a timely manner is key. The project is scheduled for a January 17, 2025, letting. Question: Any questions related to this RFQ should be submitted in writing to Scott Coren, City Manager, scoren@cityofhighwood.org. Questions received by the City, including the City's responses will be consolidated and posted electronically. The deadline for submitting questions is 10:00 AM on July 16, 2024. Engineers will provide written acknowledgment of each addendum issued with their statement of qualifications submission. Oral explanations will not be binding. No clarifications, interpretations or addenda shall be issued after 10:00 am on July 17, 2024. It is the sole responsibility of the Engineer to check online to determine if an addendum has been posted. The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$2,000,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
346
Active Projects
203
Bidding Soon
3,750
All Active Projects
1,462
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 23, 2025

img_map_placeholder

Washington Ave, Highwood, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.