BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and addition to a mixed-use development in Framingham, Massachusetts. Completed plans call for the addition of a parking garage; for the demolition of a parking garage; for site work for a parking garage; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The MASSACHUSETTS PORT AUTHORITY is soliciting Statements of Qualifications from TRADE CONTRACTORS interested in performing work for L1629 FRAMINGHAM LOGAN EXPRESS GARAGE EXPANSION. The Authority is seeking Qualification Statements from Trade Contractors who have a demonstrated experience in the construction and implementation of similar work in terms of scale and complexity as required for the FRAMINGHAM LOGAN EXPRESS GARAGE EXPANSION. In accordance with Massachusetts construction manager at-risk requirements, MGL Chapter 149A Section 8, Qualification Statements are being requested from trade contractors capable of performing the following classes of work: MASONRY, MISCELLANEOUS METALS; WATERPROOFING; ROOFING; GLASS AND GLAZING; ACOUSTICAL TILE; TERRAZZO; PAINTING; ELEVATORS; FIRE PROTECTION; PLUMBING; HEATING, VENTILATION AND AIR CONDITIONING; AND ELECTRICAL. All questions relative to your submission shall be directed to CPBidQuestions@massport.com. In the subject line of your email, please reference the MPA Project Name and Number. It is strictly prohibited for any proponent to contact anyone else from Massport about this project from the time of this solicitation until award of the project to the successful proponent. The estimated cost of the trade contractors' portion of this phase of the Project is approximately $38M and the construction duration for this phase is approximately 15 months. The estimated value of work to be performed by trade contractors is as follows: Masonry: $80,400 Miscellaneous Metals: $759,220 Waterproofing: $277,500 Roofing : $250,000 Glass and Glazing : $679,640 Terrazzo : $267,500 Acoustical Tile : $124,102 Painting: $63,990 Elevators : $672,820 Fire Protection : $399,640 Plumbing: $1,193,000 Heating, Ventilation, and Air Conditioning : $86,700 Electrical: $6,261,630

Post-Bid

Parking Garage

$3,800,000.00

Public - State/Provincial

Addition, Demolition, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

61 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
336
Active Projects
178
Bidding Soon
3,149
All Active Projects
1,301
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2024

October 7, 2024

img_map_placeholder

11 Burr St, Framingham, MA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.