BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 17, 2026 at 8:00 PM

Updated May 21, 2026

Demolition, site work, paving and new construction of a bridge / tunnel in Hartland, Wisconsin. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

T Hartland, 570th Street, Dry Run Bridge B-47-0232, LOC STR Pierce County Removals, Grading, Aggregate, Structure Replacement, Erosion Control, Permanent Signing, Traffic Control, Restoration. Estimate Anticipated Funding $250,000 - $499,999 Unless otherwise specified in this advertisement, the Department will issue bidding proposals only to those who have established their qualifications for the work to be bid upon. Any prospective bidder who has not established their qualifications must file a sworn statement with the Department not less than TEN business days prior to the time set for submitting bidding proposals on a form furnished by the Department. The Department will evaluate this statement and will issue bidding proposals as it deems warranted. Any prospective bidder who has not established their qualifications must file a sworn statement with the Department not less than TEN business days prior to the time set for submitting bidding proposals on a form furnished by the Department Question Deadline 04/13/2026 at 11:45 PM CT Questions will be allowed up to 11:45 a.m. the day before the letting, however any question submitted after 2 p.m. the Thursday prior to the letting may not have sufficient time to prepare a thorough response or develop a contract addenda. WI DOT - 026 - T Hartland, 570th Street *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. ECS Project Number 59:4320 ECS Midwest, LLC. (ECS) advanced two (2) standard penetration test borings in the general vicinity of the proposed construction at locations selected by Ayres Associates, Inc. In addition, ECS implemented a laboratory-testing program to help characterize the physical and engineering properties of the subsurface soils. This report contains a description of the exploratory and testing procedures, presents our findings and evaluations, and includes the following. _ A brief description of the field and laboratory test procedures and results. _ A description of the observed surface topographical features and site conditions. _ A description of area and site geologic conditions. _ A description of the interpreted subsurface soil stratigraphy with pertinent available physical properties. _ Copies of our subsurface exploration (test boring logs). _ Foundation recommendations. _ Recommended bridge approach pavement design parameters.

Bid Results

Bridges / Tunnels

$703,396.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

64

9

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
285
Active Projects
153
Bidding Soon
2,214
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2026

May 14, 2026

Project location map

570th St, Hartland, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.