BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 25, 2025 at 7:00 PM

Updated February 26, 2025

Site work and paving for a mixed-use development in Hartland, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Project involves approximately 23,300 S.Y. of pavement pulverizing, shaping, and grading, approximately 19,700 S.Y. of pavement milling, approximately 1,500 L.F. of concrete curb and gutter replacement, reconstruction of curb ramps, roadway base patching, concrete sidewalk replacement, asphalt and concrete driveway removal and replacement, asphalt binder and surface course paving, utility structure adjustment and repairs, miscellaneous pavement patching, pavement markings, erosion control, traffic control, and sod restoration. Est. Value: $ 1,400,000.00 Est. Completion Date: Sept. 5, 2025 Pre-Qualification: Yes The Project Manager for this Project is Peter W. Gesch, P.E., who may be contacted at Ruekert & Mielke, Inc., W233 N2080 Ridgeview Parkway, Waukesha, WI 53188-1020, (262) 542- 5733, regarding the Project. A portion of this Work is part of a Local Roads Improvement Program (LRIP) Project. All Work is included in a single prime contract. Each entity obtaining Bidding Documents from the Issuing Office will be designated as a Plan Holder of Record. Bids received from entities who are not Plan Holders of Record may be re turned as being nonresponsive. A Bidder's qualification statement must be delivered to Village of Hartland at least 5 days before the Bid opening date. Bids shall be accompanied by a Bond or Certified Check payable to Village of Hartland equal to 5 percent of the Bid. If the successful Bidder fails to execute the Contract and furnish payment and performance bonds within 15 days after the award, the Check or Bid Bond may be forfeited to Village of Hartland as liquidated damages. Construction time is of the essence. Completion delays are subject to liquidated damages. The Village of Hartland reserves the right to accept the most advantageous Bid, or to reject any and all Bids. Award of Work described herein is subject to the provisions of the Wisconsin Statutes. Project is located in the Village of Hartland on River Reserve Drive, Kestrel Way, E. Park Avenue, W. Park Avenue, Switch Grass Court, Prairie Grass Court, River Grove Lane, Westlyn Court and W. Capitol Drive.

Award

Roads / Highways

$1,467,879.00

Public - City

Paving, Site Work

4

17

6

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
338
Active Projects
133
Bidding Soon
2,051
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2025

April 21, 2025

Project location map

Multiple Locations, Hartland, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.