Published April 14, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a mixed-use development in Hartland, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; and road / highway.

This project was awarded to Stark Pavement Corp. for the amount of $1,210,771.25 Project involves approximately 24,000 S.Y. of pavement pulverizing, shaping, and grading, approximately 4,900 S.Y. of pavement milling, approximately 890 S.Y. of asphalt trail repaving, approximately 1,000 L.F. of concrete curb and gutter replacement, reconstruction of 14 curb ramps, roadway base patching, concrete sidewalk replacements, asphalt and concrete driveway removal and replacement, asphalt binder and surface course paving, colored concrete placement, fiber reinforced concrete placement with decorative scoring, utility structure adjustments and repairs, pavement markings, erosion control, miscellaneous pavement patching, traffic control, and sod restoration. All work is included in a single prime contract. Bidding Documents, including Drawings and Specifications, may be examined at the offices of Village of Hartland and the Consulting Engineer during regular business hours. Digital project Bidding Documents are available online for a fee. Partial sets of Bidding Documents are not available. Each entity obtaining Bidding Documents from the Issuing Office will be designated as a Plan Holder of Record. Bids received from entities who are not Plan Holders of Record may be returned as being nonresponsive. A Bidder's qualification statement must be delivered at least 5 days before the Bid opening date. Bids must be accompanied by a Bond or Certified Check equal to 5 percent of the Bid. If the successful Bidder fails to execute the contract and furnish payment and performance bonds within 15 days after the award, the Check or Bid Bond may be forfeited as liquidated damages. Construction time is of the essence. Completion delays are subject to liquidated damages. The Village of Hartland reserves the right to accept the most advantageous Bid or to reject any and all Bids. Award of Work is subject to the provisions of the Wisconsin Statutes. The Project Manager for this Project is Peter W. Gesch, P.E., who may be contacted at Ruekert & Mielke, Inc., W233 N2080 Ridgeview Parkway, Waukesha, WI 53188-1020, (262) 542-5733 regarding the Project. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all Plan Holder's of Record. Questions received from Bidders that do not, in Engineer's opinion, allow sufficient time to respond prior to the date for opening of Bids will not be answered

Award

Roads / Highways

$1,210,771.00

Public - City

Paving, Site Work

5

18

4

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
417
Active Projects
218
Bidding Soon
3,373
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2026

May 4, 2026

Project location map

Multiple Locations, Hartland, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.