Site work and paving for a civil project in Mukilteo, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Project Description: the Work to Be Performed Under These Specifications Consists of Furnishing All Labor, Tools, Materials, and Equipment Necessary for the 2024 Wwtp Erosion Repair Project. This Project Will Require Clearing, Grubbing and Temporary Grading to Install New Roadside Runoff Conveyance Structures and a New Stormwater Outfall to Big Gulch Creek. This Work Will Require the Removal and Replacement of Existing Pavement and Thickened Edge as Well as the Removal of an Existing Pipe and Catch Basin That Convey Roadside Runoff to an Unnamed Tributary of Big Gulch Creek. Contractor to Implement Temporary Erosion and Sedimentation Control Measures, Including a Stabilized Construction Entrance. Contractor to Provide a Temporary Stormwater Collection and Bypass System to Convey Upstream Stormwater Around the Work Area During Construction. The Project Includes the Construction of a New 24-inch Stormwater Pipeline and 6-inch Underdrain With Cleanout, Installation of Two New Type 2 Catch Basins, and Construction of a New Outfall Dissipation Pad and Gabion Basket Structure Landward of the Big Gulch Creek Ordinary High-water Level (Ohwl). The Project Also Includes the Placement of 6-8 Logs/large Wood Pieces Within the Channel of an Adjacent Unnamed Tributary Shown on the Contract Plans, as Directed by the City of Mukilteo. This Wood Placement Will Require No Filling of the Channel or Anchoring of the Wood. This Wood Will Be Sourced From the Trees Removed by the Contractor During Clearing and Grubbing, in Coordination With the City of Mukilteo. Contractor to Restore All Work Areas to the Pre-disturbed Grade and Revegetate With a Diversity of Native Plant Species as Shown on the Contract Plans. No Work Shall Be Performed Within the Ohwl Boundaries of Big Gulch Creek. The Estimated Cost for This Project is in a Range of $250,000 to $350,000. The Work Described in These Contract Documents Shall Be Physically Completed Within 20 Working Days. Pre-bid Meeting: the Contractor is Responsible for Visiting the Site Limits Prior to Bid. No Pre-bid Site Inspection or Meeting is Scheduled. Please Note the Requirements of Section 1-02.4 of the Wsdot Standard Specifications. This Contract Involves Public Work. Workers Performing Work in Conjunction With the Contract Shall Receive a Prevailing Rate of Wage Pursuant to the Prevailing Wages on Public Works Act (Chapter 39.12 Rcw). All Technical Questions Regarding This Project Are to Be Submitted in Writing No Later Than 3:00 P.m. On Monday, July 22, 2024. No Verbal Clarifications Will Be Made. Where Necessary, Addenda Will Be Completed by Email Only and Each Must Be Acknowledged in the Bid Submittal. All Addenda Will Be Posted for This Project at online by Thursday, July 25, 2024. Bid Bond Required: Each Bid Shall Be Accompanied by a Bid Bond in the Form of Certified Check, Cashiers Check, or Surety Bond in an Amount Equal to at Least 5% of the Amount of Such Bid. Should the Successful Bidder Fail to Enter Into Such Contract and Furnish Satisfactory Performance Bond Within the Time Stated in the Specifications, the Bid Bond Shall Be Forfeited to the City of Mukilteo. All Bids or Proposals Must Be in Writing on the Form Found in the Bid Documents, Sealed, and Received by the City on or Before the Date and Time Mentioned Above. The City of Mukilteo Reserves the Right to Reject Any and All Bids and to Waive Informalities or Minor Irregularities, and After Careful Consideration of All Bids and Factors Involved, Make the Award to Best Serve the Interests of the City of Mukilteo. The City of Mukilteo is an Equal Opportunity Employer and Invites Responsive Bids From All Qualified Responsible Bidders. This Project is Funded by the City of Mukilteo. Neither the State of Washington Nor Any of Its Departments or Employees Are, or Shall Be, a Party to Any Contract or Any Subcontract Resulting From This Solicitation for Bids. The City of Mukilteo in Accordance With Title Vi of the Civil Rights Act of 1964, 78 Stat. 252, 42 Usc 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle a, Office of the Secretary, Part 21, Nondiscrimination in Federally-assisted Programs of the Department of Transportation Issued Pursuant to Such Act, Hereby Notifies All Bidders That It Will Affirmatively Ensure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises as Defined at 49 Cfr Part 26 Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, National Origin, or Sex in Consideration for an Award. The City of Mukilteo Encourages Participation in All Its Contracts by M/wbe Firms Certified by the Office of Minority and Women's Business Enterprises (Omwbe). Participation May Be Either on a Direct Basis in Response to This Solicitation or as a Subcontractor to a Bidder/proposer. No Preference Will Be Included in the Evaluation of Bids/proposals, No Minimum Level of M/wbe Participation Shall Be Required as a Condition for Receiving an Award and Bids/proposals Will Not Be Rejected or Considered Non-responsive on That Basis. No Voluntary M/wbe Goals Have Been Established for This Project for Either Mbe or Wbe Participation. Prospective Bidders Shall Make All Requests for Clarification to Luke Thornton, Cip Project Manager, 11930 Cyrus Way Mukilteo, Wa 98275, or by Email to Lthornton@mukilteowa.gov. **Bid Notes: The Official Bid Clock Will Be Monitored by a City Official Receiving All Bids. Address Bid Submittal as Follows: Bid Submittal Enclosed for: Wwtp Erosion Repair Project No. Sw220200 Contract No. 2024-015 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$280,671.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
49
Bidding Soon
909
All Active Projects
341
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2024

August 30, 2024

img_map_placeholder

To Be Determined, Mukilteo, WA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.