Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a bridge / tunnel in Greenwood, Arkansas. Completed plans call for site work for a bridge / tunnel.
Note: This Proposal Contains the Job Special Provision "Contractor Certification" That Requires Contractors and Subcontractors Be Sspc-qp1 and Sspc-qp2 Certified by the Sspc Painting Contractor Certification Program Prior to Bidding on This Project. The Purpose of This Project is to Paint One Structure Over the Arkansas River on Highway 64 in Sebastian County. This Project Consists of Cleaning and Painting Existing Structural Steel, Maintenance of Traffic, and Misc. Items. Routes: 64 Sections: 0 County: Sebastian Length: No Project Length. The Successful Bidder Will Be Required to Complete This Contract Within Two Hundred (200) Working Days. Question Deadline 10/30/2024 - Questions pertaining to projects during the advertisement period should be addressed to the Program Management Division at pmd@ardot.gov. The deadline to submit a question isthe Wednesday prior to the scheduled letting date. A question submitted after the close of business on the Wednesday prior to the scheduled letting date may not receive a response. In order to have a bid considered, contractors must furnish a proposal guaranty consisting of either a bidder's bond or a certified or cashier's check in the amount of five percent (5%) of the total amount bid. In order for a bond to be acceptable to the Department, the company issuing the bond must be named in the Department of Treasury Listing of companies holding Certificates of Authority as acceptable sureties on Federal Bonds and as acceptable reinsuring companies. The Underwriting Limitation of the bonding company shall be adhered to. Any excess (between the face amount of the Bond and the Underwriting Limitation) shall be protected by reinsurance provided by an acceptable reinsuring company. These contracts are subject to normal prequalification, licensing and bonding requirements, applicable labor laws, non-discrimination provisions, wage rate laws and other Federal laws including the Fair Labor Standards Acts of 1938. The Work Hours Act of 1962 and Title VI of the Civil Rights Act of 1964 also apply. The Arkansas Department of Transportation (ARDOT) complies with all civil rights provisions of federal statutes and related authorities that prohibit discrimination in programs and activities receiving federal financial assistance. Therefore, ARDOT does not discriminate on the basis of race, sex, color, age, national origin, religion (not applicable as a protected group under the Federal Motor Carrier Safety Administration Title VI Program), disability, Limited English Proficiency (LEP), or low-income status in the admission, access to and treatment in ARDOTs programs and activities, as well as ARDOTs hiring or employment practices. Complaints of alleged discrimination and inquiries regarding ARDOTs nondiscrimination policies may be directed to Civil Rights Officer Joanna P. McFadden (ADA/504/Title VI Coordinator), P. 0. Box 2261, Little Rock, Arkansas 72203-2261, (501) 569-2298, (Voice/TTY 711), or the following email address: joanna.mcfadden@ardot.gov. ARDOT - Hwy. 64 Arkansas River Bridge Painting (S)
Bid Results
Bridges / Tunnels
$3,676,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 6, 2024
January 6, 2025
AR-64, Greenwood, AR
Related To This Project
Greenwood, AR
Bid Date: Sep 19 2024
Greenwood, AR
Bid Date: Oct 01 2024
Greenwood, AR
Bid Date: Nov 05 2024
Greenwood, AR
Bid Date: Dec 10 2024
Greenwood, AR
Bid Date: Jul 16 2024
Greenwood, AR
--
Greenwood, AR
--
Greenwood, AR
Bid Date: Sep 24 2024
Greenwood, AR
Bid Date: May 14 2024
Greenwood, AR
Bid Date: Apr 09 2024
Greenwood, AR
Bid Date: Mar 12 2024
Greenwood, AR
Bid Date: Mar 04 2024
Greenwood, AR
Bid Date: Feb 27 2024
Greenwood, AR
Bid Date: Feb 06 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.