EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 13, 2024 at 7:00 PM

Updated October 1, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Lake Forest, Illinois. Design plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The City of Lake Forest is seeking a qualified engineering firm to perform Phase I Design Engineering services for the replacement of Ringwood Bridge. Phase I Design Engineering Services will include, but are not limited to, project design, extensive community outreach and historic preservation coordination, preliminary cost estimate, and the procurement of all the necessary permits. The project will require reviews and approvals by IDOT. As of December 13, 2024, City Council has approved an engineering/design team. A Tentative construction date would be determined upon award of federal funds, however, is estimated around 2029/2030 at the earliest. Construction of this project is currently unfunded and dependent on receiving an Illinois Special Bridge Program (ISBP) grant award with the remaining balance to be funded by MFT funds. Any design and construction amount above that would be local capital funds. The current estimated construction cost is $4,000,000 which is solely a rough estimate as a bridge-type has not yet been determined.

Design

Bridges / Tunnels

$4,000,000.00

Public - City

Demolition, New Construction, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
289
Active Projects
188
Bidding Soon
2,431
All Active Projects
1,213
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2029

img_map_placeholder

Ringwood Rd, Lake Forest, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Replacement of Ringwood Bridge Phase I

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.