Site work and paving for a civil project in McClellan, California. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; and water / sewer project.

**As of October 25, 2024 Project has not been awarded . Anticipated award date is on November 13, 2024. .** PROJECT DESCRIPTION The work to be performed under this contract includes furnishing of all labor, materials, tools and equipment for the Upper Dry Creek Interceptor Relief Project, to relieve the Dry Creek Interceptor of capacity deficiencies experienced under existing wet weather and future buildout conditions. The Work consists of installation of approximately 9,200 linear feet of 36-inch gravity sewer, the installation of 19 sanitary sewer manholes, modification to an existing SacSewer sanitary sewer structure, construction of a new junction structure, the rehabilitation of three (3) CMP culverts, and pavement restoration. Most of the Work is in public right-of-way, however some of the work is located on private property and on McClellan Airport (County) property. The entire project is within the unincorporated County of Sacramento, California. All work associated with this Contract shall include, but not be limited to, mobilization/demobilization, sewer flow control, dewatering of excavation, sheeting, shoring and bracing of excavation, traffic control in accordance with approved plans, erosion and sediment control, cleaning, debris removal and disposal, installation of new manholes and junction structures, modification of existing diversion structures, installation of new pipe with open-cut and tunneling construction methods, rehabilitation of culverts, inspection and testing, discharge pretreatment, permitting, fencing, site and landscaping restoration (in- kind), and such other items or details that are required by the Contract Documents (plans and specifications). The Engineer's Estimate for this Project is approximately $19,240,000. BONDS: Each bid must be submitted on the bid forms provided in the Contract Documents. Each bid must also be accompanied by security in the form of a bid bond issued by a corporate surety, a certified check or cashier's check payable to the Treasurer of Sacramento County, or cash from an amount not less than ten percent (10%) of the aggregate sum of the bid. The successful bidder shall be required to execute a Material and Labor Payment Bond and Performance Bond, issued by a corporate surety, acceptable to the Sacramento Area Sewer District, each for not less than one hundred percent (100%) of the contract price. Pursuant to the California Contract Code Section 22300, the contractor may, at its own expense, substitute securities for any money being withheld by the County to ensure performance under this contract. The successful bidder will have Three Hundred and Sixty-Six (366) working days to complete the Project from the Notice to Proceed, which is based on work close-out by March 1, 2026. Any questions regarding the type of work to be done may be addressed to Catherine Armstrong at armstrongca@sacsewer.com or (916) 876-7297. Question Deadline 08/13/2024 at 11:00 AM PT The Board reserves the right to reject any or all bids, to waive any formality in any bid, and to determine which bid, in the judgment of the Board, is the lowest responsive bid of a responsible bidder.

Award

Water / Sewer

$15,958,193.00

Public - City

Paving, Site Work

78

13

22

8

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
36
Bidding Soon
1,384
All Active Projects
617
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2024

November 25, 2024

img_map_placeholder

3028 Peacekeeper Way, McClellan, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.