BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 20, 2024 at 8:00 PM

Updated September 21, 2024

Site work and paving for a sidewalk / parking lot in Belleville, Michigan. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Reference Number : 0000357534 The proposed project consists of approximately 16,500 sf of asphalt parking expansion with concrete curbs and pavement. The anticipated start date is September 1, 2024 and completion by October 15, 2024. Question Deadline 07/25/2024 at 10:00 AM ET, Questions are submitted online : No , All RFIs shall be emailed to Alan J. Cruz, PE, ajcruz@hengineers.com. (No calls) . The Owner Reserves the Right to Waive Any Information or to Reject Any and/or All Bids. Bidders May Not Withdraw Their Bid Within 60 Days After the Date of Bid Opened. The Owner and Engineer Will Further Assess the Bids Based on the Following Criteria. 1. Cost Effectiveness 2. Similar Past Project Experience 3. Ability to Complete Project Within Timeframe The Following Items Are Required for a Complete Bid Submittal: 1. 5% Bid Bond 2. Completed Itemized Bid Sheet 3. Completed and Signed Exhibit 'a' Proposal SEALED BIDS will be accepted at the address below. Bid must be clearly labeled 5TH AND LIBERTY PARKING LOT EXPANSION Two (2) copies of the bid proposals shall be submitted to: City Clerk City of Belleville 6 Main Street Belleville, MI 48111 All RFIs shall be emailed to Alan J. Cruz, PE, ajcruz@hengineers.com. (No calls) The deadline for Request for Information (RFI) is July 25, 2024, 10am (est). Description This work shall be in accordance with Division 2, Section 208 of the 2020 MDOT Standard Specifications except as herein specified. General The CONTRACTOR shall furnish and install of all soil erosion and sedimentation control measures as called for in the plans or as directed by the ENGINEER. The CONTRACTOR shall maintain of all measures to ensure that sediment does not build up in the drainage structure. This does not include poking holes in the silt sacks to allow flow into the structure. The silt sack has to be removed from the structure, cleaned thoroughly, and reinstalled in the structure. The CONTRACTOR shall clean the sediment out of all the drainage structures after the project has been completely restored. All measures must remain in place until the project area has been completely restored and vegetation has been established.

Award

Sidewalks / Parking Lot

$287,355.00

Public - City

Paving, Site Work

12

6

6

5

Subscribe For Documents

66 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
361
Active Projects
193
Bidding Soon
2,465
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2024

September 1, 2024

Project location map

N Liberty St & 5th St, Belleville, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.