Published July 17, 2024 at 8:00 PM
Updated October 1, 2024
Site work and new construction of a mixed-use development in Cleveland, Ohio. Completed plans call for the construction of a pre-engineered storage facility; for site work for a pre-engineered storage facility; and transportation facility.
Board of Directors that a Request for Qualifications ("RFQ") is issued by the Cleveland-Cuyahoga County Port Authority for the following project: GENERAL CARGO TERMINAL ELECTRIFICATION & WAREHOUSE A CONSTRUCTION MANAGER AT RISK The successful firm/team will assist the Port Authority with construction management at risk services to complete the above referenced project. The Port Authority reserves the right to reject any and all submissions, to waive any technicalities, to request additional information, and to otherwise proceed in accordance with the best interests of the Port Authority. Any submissions may be withdrawn or amended prior to the closing deadline. Under no circumstance will the Port Authority be responsible for any costs incurred by firms in responding to this RFQ and any subsequent phases of this evaluation and negotiation process. Professional design services are being performed by the Contracting Authority under a separate contract. All aspects of the project and related issues will be implemented and operated consistent with the Contracting Authority and/or Owner’s policies and procedures. This project has a MBE/FBE Goal of 30%. EDGE participation does not apply to this project. The Port of Cleveland does not certify firms but recognizes certification from other local and state agencies. The Project will improve cargo handling travel lanes and more efficiently utilize Terminal real estate, bring the Terminal’s largest warehouse (Warehouse A) to a state of good repair, continue the implementation of the Port Authority’s Stormwater Master Plan to improve the quality of Terminal stormwater discharging into Lake Erie, and make necessary electrification investments to prepare the Port for a zero-emissions future. The Project consists of the following major components (Figure 1): 1. West 3rd Lot Cargo Movement Efficiency Improvements: Demolish existing cargo handling equipment maintenance facility and hiring hall building and reconstruct as annexed wings off Warehouse A. 2. Warehouse A Rehabilitation and Modernization: Bring Warehouse A to a state of good repair with improvements, including, but not limited to, structural steel repairs and coatings, security and communication improvements, new central bay overhead crane, overhead door consolidation and replacement, window replacement, restroom facility upgrades and enhancements, LED lighting conversion, concrete slab and sill replacement, and fire suppression system replacement. Modify exterior pavement grades with interior elevated grades of Warehouse A. Repair or replace existing roof and assess roof structure for solar panel outfitting suitability. 3. Electrification and Stormwater Enhancements: Bring in new medium/high voltage Cleveland Public Power (CPP) feed to Warehouse A to establish the Terminal’s electric distribution hub. From the newly established power distribution hub, run sufficient power to the maintenance facility wing and locomotive storage location on site. Consolidate drainage in Project area and direct to previously installed or new stormwater treatment infrastructure in accordance with the Port’s Stormwater Master Plan.
Post-Bid
Warehouse / Distribution - Pre-Engineered Storage Building
$30,000,000.00
Public - County
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 29, 2024
April 1, 2025
To Be Determined, Cleveland, OH
Related To This Project
Cleveland, OH
Bid Date: Aug 12 2024
Cleveland, OH
Bid Date: Aug 16 2024
Cleveland, OH
Bid Date: Aug 07 2024
Cleveland, OH
Bid Date: Aug 19 2024
Cleveland, OH
Bid Date: Aug 16 2024
Cleveland, OH
Bid Date: Aug 02 2024
Cleveland, OH
--
Cleveland, OH
Bid Date: Aug 08 2024
Cleveland, OH
--
Cleveland, OH
Bid Date: Aug 09 2024
Cleveland, OH
Bid Date: Jul 17 2024
Cleveland, OH
Bid Date: Aug 01 2024
Cleveland, OH
--
Cleveland, OH
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
![](https://projects.constructconnect.com/hubfs/science-bokeh2%20(1).webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.