Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 5, 2025 at 8:00 PM
Updated June 6, 2025
Site work and outdoor lighting for a transportation facility in Sebring, Florida. Completed plans call for site work for a transportation facility; and for outdoor lighting for a transportation facility.
***Apparent low bid from previous bid opening: Trinity Electrical Contractors Inc - $371,060 Bid Security Guarantee will be required with each bid as a certified check on a solvent bank or a bid bond in the amount of five (5) percent of the total amount of the bid, made payable to the Sebring Airport Authority. Bonding Requirements The successful bidder will be required to furnish separate performance and payment bonds each in an amount equal to 100% of the contract price. Contract Time Time for substantial completion for work under the base bid is 81 calendar days from the date of the Notice to Proceed, with final completion and acceptance within 111 calendar days after the date when the Contract Time commences to run. This project is subject to liquidated damages as prescribed within the project manual. Liquidated Damages If Contractor fails to achieve substantial completion of the balance of the Project on or before the date of substantial completion set forth as may be extended by Change Order, Contractor shall pay to Owner liquidated damages in the amount of $250.00 per calendar day for each calendar day the date of substantial completion is delayed beyond the date of substantial completion. Submittal of Proposals Additional information and instruction for submittal of a proposal are provided within the Instructions-to-Bidders. Modification to the project documents may only be made by written addendum by the Owner or Owners authorized Representative. The proposal must be made on the forms provided within the contract documents. Bidders must supply all required information prior to the time of bid opening. Projectt no - 202415202 E001 Award of Contract Award of the contract shall be made to the lowest responsible and responsive bidder, whose bid conforms to the written requirements of the Sponsor. Bids may be held by the Sebring Airport Authority for a period not to exceed 60 days from the date of the bid opening for the purpose of evaluating bids prior to award of contract. By submitting a bid, each Bidder agrees that the bid shall remain valid for at least 60 days from the date of the bid opening. Rights to waive any informality or irregularity in any bid or bid guaranty, to reject any or all bids, to re-bid the project, to award or refrain from awarding a contract for the work, and to negotiate with the apparent low and responsive bidder to such extent as may be beneficial to the Sebring Airport Authority, are reserved. Question Deadline 04/18/2025 A bidder requiring a clarification or interpretation of the project documents shall make a written request to the Owner or Engineer
Award
Transportation Terminals
$222,270.00
Public - City
Outdoor Lighting, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 28, 2025
May 28, 2025
128 Authority Ln, Sebring, FL
Related To This Project
Sebring, FL
Bid Date: Sep 05 2024
Sebring, FL
Bid Date: Aug 28 2024
Sebring, FL
Bid Date: Sep 10 2024
Sebring, FL
Bid Date: Sep 03 2024
Sebring, FL
Bid Date: Oct 01 2024
Sebring, FL
Bid Date: Oct 07 2024
Sebring, FL
Bid Date: Oct 21 2024
Sebring, FL
Bid Date: Oct 16 2024
Sebring, FL
Bid Date: Aug 09 2024
Sebring, FL
Bid Date: Jul 31 2024
Sebring, FL
Bid Date: Aug 16 2024
Sebring, FL
Bid Date: Jul 05 2024
Sebring, FL
Bid Date: Jul 05 2024
Sebring, FL
Bid Date: Jul 01 2024
Sebring, FL
Bid Date: Jun 11 2024
The Best Gift for Your Business? Seeing the Future of Construction.
We’re unwrapping exclusive project leads early this year. Gain instant access to commercial data that keeps you steps ahead of the competition. Sign up today to see the projects others won't discover until they're already spoken for.
