Site work and outdoor lighting for a transportation facility in Sebring, Florida. Completed plans call for site work for a transportation facility; and for outdoor lighting for a transportation facility.

***Apparent low bid from previous bid opening: Trinity Electrical Contractors Inc - $371,060 Bid Security Guarantee will be required with each bid as a certified check on a solvent bank or a bid bond in the amount of five (5) percent of the total amount of the bid, made payable to the Sebring Airport Authority. Bonding Requirements The successful bidder will be required to furnish separate performance and payment bonds each in an amount equal to 100% of the contract price. Contract Time Time for substantial completion for work under the base bid is 81 calendar days from the date of the Notice to Proceed, with final completion and acceptance within 111 calendar days after the date when the Contract Time commences to run. This project is subject to liquidated damages as prescribed within the project manual. Liquidated Damages If Contractor fails to achieve substantial completion of the balance of the Project on or before the date of substantial completion set forth as may be extended by Change Order, Contractor shall pay to Owner liquidated damages in the amount of $250.00 per calendar day for each calendar day the date of substantial completion is delayed beyond the date of substantial completion. Submittal of Proposals Additional information and instruction for submittal of a proposal are provided within the Instructions-to-Bidders. Modification to the project documents may only be made by written addendum by the Owner or Owners authorized Representative. The proposal must be made on the forms provided within the contract documents. Bidders must supply all required information prior to the time of bid opening. Projectt no - 202415202 E001 Award of Contract Award of the contract shall be made to the lowest responsible and responsive bidder, whose bid conforms to the written requirements of the Sponsor. Bids may be held by the Sebring Airport Authority for a period not to exceed 60 days from the date of the bid opening for the purpose of evaluating bids prior to award of contract. By submitting a bid, each Bidder agrees that the bid shall remain valid for at least 60 days from the date of the bid opening. Rights to waive any informality or irregularity in any bid or bid guaranty, to reject any or all bids, to re-bid the project, to award or refrain from awarding a contract for the work, and to negotiate with the apparent low and responsive bidder to such extent as may be beneficial to the Sebring Airport Authority, are reserved. Question Deadline 04/18/2025 A bidder requiring a clarification or interpretation of the project documents shall make a written request to the Owner or Engineer

Award

Transportation Terminals

$222,270.00

Public - City

Outdoor Lighting, Site Work

36

10

14

8

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
341
Active Projects
89
Bidding Soon
2,487
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2025

May 28, 2025

Project location map

128 Authority Ln, Sebring, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.