BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 25, 2024 at 8:00 PM

Updated September 26, 2024

Renovation of a fire / police facility in Marston, Missouri. Completed plans call for the renovation of a fire / police facility.

The Work of Project is defined by the Contract Documents and consists of the following Construction work to remodel the Cooper County 9-1-1 Dispatch Center, located in the basement of the Cooper County Law Enforcement Center at 200 Main Street, Boonville, MO 65233. This RFP relates to the work including removal of seven windows, demolition of a small section of wall, the construction of two new walls, enclosing areas where the windows are removed, painting, electrical system rework and new floor covering. The Supplier is responsible for all demolition work, disposal of debris, and all aspects of the remodel including framing, finish and flooring except electrical. Supplier is expected to work cooperatively with electrical contractor and (any) other trade staff onsite. This project is being undertaken in an effort to provide additional functional space and to increase the number of dispatch positions in the space. Also attached is a rendering of a proposed equipment layout as provided by a console furniture vendor and is furnished solely for clarification to Supplier. The Owner reserves the right to waive informalities in bids and to reject all bids. Law Enforcement Center 911 Interior Alterations

Under Construction

Fire / Police

$107,082.00

Public - County

Renovation

5

13

5

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
3
Bidding Soon
360
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2024

September 2, 2024

Project location map

200 E Main St, Marston, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.