Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 17, 2024 at 8:00 PM

Updated August 16, 2024

This is a service / maintenance or supply contract in Woodfin, North Carolina. Contact the soliciting agency for additional information.

Basic Water Testing of campus buildings closed loop chilled & hot water piping systems, and Basic Service, Inspection and Water Testing for eight (8) open loop condenser water cooling tower systems on campus. Refer all inquiries to Lane Brown, Purchasing Agent Lbrown@unca.edu Phone: 828-232-2285 Fax: 828-251-6743 Cooling towers to be covered under this contract agreement are located at: 1. Governor's Residence Hall 2. Highsmith Student Center 3. Karpen Hall 4. Owen Hall 5. Ramsey Library 6. Robinson Hall 7. Sherrill Center 8. Zeis Science Building The Contract shall have an initial term of three (3) years, beginning on September 27, 2024. At the end of the Contract's initial term, UNC Asheville shall have the option, in its sole discretion, to renew the Contract on the same terms and conditions for up to two (2) additional one-year terms. Question Deadline 08/02/2024 at 3:00 PM ET Written questions shall be emailed to Lbrown@unca.edu by the date and time specified above.

Post-Bid

Educational

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
87
Bidding Soon
1,455
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2024

September 27, 2024

Project location map

220 Campus Dr, Woodfin, NC

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed