BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Port Saint Lucie, Florida. Completed plans call for the renovation of a municipal facility.

City Hall Renovations The purpose of this narrative is to secure a qualified, licensed general contractor to complete the project construction as specified herein and in accordance with the contract drawings. This project involves an interior renovation of a portion of the Port St. Lucie City Hall located at 121 SW Port St Lucie Boulevard, Building A, Port St Lucie, Florida, 34984. The services will include providing adequate and appropriate labor, machinery, materials, supplies, equipment, tools, supervision, insurance, permits, and incidentals. The project consists of demolishing and renovating the restrooms, one on each of the three levels, and expanding and renovating the existing public lobby areas on the first level of the City Hall. Exterior improvements to the City Hall complex parking include additional parking areas and drainage enhancements. Work components include demolition, concrete, concrete reinforcement, electrical, lighting, HVAC, and plumbing work. Questions deadline: 7/29/24 at 11:00 AM Restrooms The restroom renovation includes the women's restroom, vestibule, and men's restroom on each level of the City Hall. The scope of work includes: o Demolition of all wall finishes and sheeting down to existing studs, all floor finishes down to base concrete, hard ceilings and framing, lighting, and mechanical elements as shown in the contract documents. o Renovation includes retiling the floors and walls, installing new hard ceilings, replacing all fixtures and equipment, connecting new plumbing and electrical lines to existing systems or installing new ones as needed, and upgrading lighting and partitions Lobby Renovation of the main public lobby areas will enhance accessibility and security features, including expanding the main access. The scope of work includes: o Demolition of all walls finishes and sheeting down to existing studs up to 1'-0" from floor level, all floor finishes down to base concrete, hard and ACT ceilings and framing, lighting, and mechanical elements as shown in the contract documents. o Renovation includes expanding by enclosing exterior porch areas with new slabs, Installing new 2-story Impact Resistant store front system, and additional mechanical equipment to supply the increased load, retiling the floors, installing new hard and ACT ceilings, replacing all fixtures and equipment, connecting new plumbing and electrical lines to existing systems or installing new ones as needed, upgrading lighting, installing new interior partition walls, repainting wall areas, and installing sound panels at the main entrance. City Hall Complex Parking Expansion includes upgrading the conditions and drainage of existing exterior parking, adding new paving, grading, and drainage for new parking areas. The contractor shall furnish, provide, and pay for all supervision, labor, materials, tools, machinery, equipment, supplies, manufactured articles, transportation, disposal, insurance, permits, licenses, incidentals, and services as applicable. This includes power, water, essential communications, general field requirements, and other costs and expenses, both direct and indirect, necessary for the renovations to the PSL City Hall. The work to be performed under this contract shall consist of furnishing and installing all tools, equipment, materials, supplies, manufactured articles, transportation, and services necessary for the performance of all labor and work required for the fulfillment of the contract in strict conformance with the contract documents. The work shall be complete, and all work, materials, and services not expressly shown or called for in the contract documents that may be necessary for the complete and proper construction of the work shall be performed, furnished, and installed by the contractor as though originally specified or shown, at no additional cost to the Town. Completion- ( 245 ) calendar days

Award

Municipal

$1,310,742.00

Public - City

Renovation

115

6

188

7

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
51
Bidding Soon
683
All Active Projects
294
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 6, 2024

November 6, 2024

img_map_placeholder

121 SW Port St Lucie Blvd, Port Saint Lucie, FL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.