Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 6, 2026 at 8:00 PM

Updated August 12, 2026

Site work and paving for a bridge / tunnel in Nashville, Michigan. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Bridge rehabilitation including concrete repairs, beam patching, silane treatment and approach work on Francis Street over Quaker Brook in the village of Nashville, Barry County. This is a Local Agency project. 0% SBP PARTICIPATION REQUIRED DBE Percent Required: 0.00% MBE (7.2%), WBE (6.9%) Control Section BFPO 08000 Net classification required for this project is 189 Cb In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Fa. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. MIDOT - 2607 704 - Bridge Rehabilitation Including Concrete Repairs, Beam Patching, Silane Treatment and Approach Work on Francis Street Question Deadline 07/17/2026 All inquiries concerning the plans and proposal for this project are to be directed to Robert Lafrance MDOT-eProposal@Michigan.gov. To be able to process and distribute an addendum, if required , all inquiries shall be made at least seven (7) calendar days before the letting

Award

Bridges / Tunnels

$139,306.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
122
Bidding Soon
1,776
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2026

August 24, 2026

Project location map

E Francis St, Nashville, MI

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed