BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 29, 2024 at 8:00 PM

Updated August 30, 2024

Site work and paving for a sidewalk / parking lot in Rosebud, Missouri. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The proposed work includes: Construction of sidewalk and sidewalk ramps for a pedestrian crossing of Highway 50 just west of Route T and the installation of rectangular rapid flashing beacons. The project will utilize MoDOT Right-of-Way and City maintenance easements for construction of the sidewalk as well as temporary construction easements for grading and tie-ins adjancent to the proposed sidewalk. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 from the current version of the Missouri Standard Specifications for Highway Construction, including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. A certified or cashiers check or a bid bond in the amount of 5% shall be submitted with each proposal. The City of Rosebud reserves the right to reject any or all bids. The project will be awarded to the lowest, responsive, responsible bidder. The DBE Goal for this project is 0%. No 2nd tier subcontracting will be allowed on this project. MODOT - Highway 50 at Route T Crosswalk

Post-Bid

Sidewalks / Parking Lot

$70,000.00

Public - City

Paving, Site Work

9

8

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
2
Bidding Soon
996
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2024

October 1, 2024

Project location map

US-50, Rosebud, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.