BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in Huntsville, Alabama. Completed plans call for the renovation of a transportation facility.

The Huntsville-Madison County Airport Authority (Owner) is requesting separate sealed proposals for the furnishing of all labor, materials, equipment and services for the EXIT LANE BREACH CONTROL ELECTRICAL PROJECT (the Project) at Huntsville International Airport (the Airport), located in Huntsville, Alabama. The subject line of the email shall state the name of the Project and the bidder's General Contractor License Number. Any bid received after the scheduled closing time for receipt of bids will be rejected. Pre-qualification of bidders is not required. The Project will consist of electrical and low voltage work on a larger project with a separate contractor for the installation of an Exit Lane Breach Control System at Huntsville International Airport. There will not be a pre-bid conference. Owner reserves the right to waive any informalities, technicalities or irregularities in the bids received, to reject any or all bids, and to enter into negotiations with the lowest responsive bidder. No bidder may withdraw his bid within 90 days after the actual date of bid opening.

Post-Bid

Transportation Terminals

$300,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
21
Bidding Soon
442
All Active Projects
171
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2024

September 2, 2024

img_map_placeholder

Facility Way SW, Huntsville, AL

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.