BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 25, 2024 at 8:00 PM

Updated August 23, 2024

Site work for a water / sewer project in Highland City, Florida. Completed plans call for site work for a water / sewer project.

The project is the installation of (16) Owner-provided Advanced Metering Infrastructure (AMI) towers at (16) various locations in the southwest sector of Polk County. Scopes of work include: Concrete, Electrical, and Installation/Erection of Towers. SEMCO Construction, Inc. encourages minority and women business enterprise bids and, in accordance with Title VI of the Civil Rights Act of 1964, all Bidders will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex or national origin in consideration for award. Subcontractors who need information or wish to review plans, specs and contract documents and/or wish to provide a sub bid and/or materials quote for project, should contact Jennifer Hall at 863-533-7193 or jhall@semco.cc. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Work consists of: 1. Construction of 50-foot AMI repeater poles and 80-foot AMI towers. The poles and towers will house a repeater provided by Master Meter and installed by Empire Pipe & Supply. 2. The contractor is responsible for the installation of the 50 pole/8' tower. The electrical contractor is responsible for the installation of the circuit breaker, conduit and power conductors to the 50 pole/80 tower. Master meter is responsible for mounting the AMI repeater, installing the antenna cable, and mounting the antenna atop the pole/tower. 3. All equipment shall be delivered to Polk County Utilities Department facility located at the Southwest Wastewater Treatment Facility 2345 Arnez Dr, Mulberry, FL 33860. The County will provide a staging area sufficient for materials storage. The Contractor will be responsible for unloading of the equipment from the delivery trucks. 4. The Contractor will be responsible for requesting access to the facility, loading the material, and transporting it to each installation site. 5. Commissioning of the Work.

Post-Bid

Water / Sewer

$1,000,000.00

Public - County

Site Work

18

13

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
437
Active Projects
200
Bidding Soon
3,089
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2024

September 23, 2024

Project location map

Multiple Locations, Highland City, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.